My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-240B.
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-240B.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2016 1:51:10 PM
Creation date
9/30/2015 10:59:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/24/2007
Control Number
2007-240B.
Agenda Item Number
7.AA
Entity Name
Utility Service co.,inc.
Subject
South County #2 tank
Supplemental fields
SmeadsoftID
6414
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
535 Courtney Hodges Blvd. <br /> P.O. Box 1350 <br /> Perry, Georgia 31069 <br /> tel: 478-987-0303 800-223-3695 <br /> fax : 478-987-2991 <br /> Utility Service Ca www.utiltiy.service.com <br /> i x C v v o v , I a <br /> LIMITED <br /> WATER TANK MAINTENANCE CONTRACT <br /> This agreement entered into, by, and between Indian River County Utilities-Vero Beach, Florida <br /> hereinafter known as the Owner, and Utility Service Co., Inc . hereinafter known as the Company. <br /> The Owner agrees to employ the Company to provide the professional service needed to maintain its <br /> 2,000,000 gallon water storage tank located at South County Road #2 Tank. <br /> This agreement outlines the Company' s responsibility for the care and maintenance of the above <br /> described water storage tank. Care and maintenance shall include the following: <br /> The Company will annually inspect and service the tank beginning in the year 2007 . The tank will be <br /> thoroughly inspected to ensure that the structure is in a sound, water tight condition. <br /> Biennially, beginning with the first washout/inspection in 2007, the tank will be completely drained and <br /> cleaned to remove all mud, silt, and other accumulations that might be harmful to the tank or its contents. <br /> This cleaning will utilize high pressure equipment with chemical injection. After cleaning is completed, <br /> the interior will be thoroughly inspected and disinfected prior to returning to service. <br /> The Company will clean and repaint the exterior of the tank at such time as complete repainting is <br /> needed. The need for exterior painting is to be determined by the appearance and protective condition of <br /> the existing paint. <br /> When painting is needed, all products and procedures will be equal to or exceed the requirements of the <br /> Florida Department of Environmental Protection, the American Water Works Association, and the <br /> Steel Structures Painting Council as to surface preparation, coating materials, and disinfection. <br /> At the time the exterior requires painting, the Company agrees to utilize a coating system which best suits <br /> the site conditions, environment, and general location of the tank. <br /> The Company will install an anti-climb device on the access ladder to prevent unauthorized persons from <br /> climbing the tower. <br /> Pagel of 3 <br /> Copyright 2002 <br /> Utility Service Co. , Inc . <br />
The URL can be used to link to this page
Your browser does not support the video tag.