My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-240D.
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-240D.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2016 1:56:18 PM
Creation date
9/30/2015 10:59:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/24/2007
Control Number
2007-240C.
Agenda Item Number
7.AA
Entity Name
Utility Service co.,inc.
Subject
Water Tank Maintenance Contract
Area
North Beach Tank
Supplemental fields
SmeadsoftID
6416
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
535 Courtney Hodges Blvd. <br /> P.O. Box 1350 <br /> Perry, Georgia 31069 <br /> tel : 478 -987-0303 800-223-3695 <br /> fax: 478-987-2991 <br /> Utility Service Ca R'R'N'AI11tR'SCr41C&CO <br /> I C 0 0 I U l , I � 0 <br /> LIMITED <br /> WATER TANK MAINTENANCE CONTRACT <br /> This agreement entered into, by, and between Indian River County Utilities-Vero Beach, Florida <br /> hereinafter known as the Owner, and Utility Service Co. , Inc. hereinafter known as the Company. <br /> The Owner agrees to employ the Company to provide the professional service needed to maintain its <br /> 800,000 gallon water storage tank located at North Beach Bolted Tank. <br /> This agreement outlines the Company' s responsibility for the care and maintenance of the above <br /> described water storage tank. Care and maintenance shall include the following: <br /> The Company will annually inspect and service the tank beginning in the year 2007 . The tank will be <br /> thoroughly inspected to ensure that the structure is in a sound, water tight condition . <br /> Biennially, beginning with the first washout/inspection in 2007, the tank will be completely drained and <br /> cleaned to remove all mud, silt, and other accumulations that might be harmful to the tank or its contents. <br /> This cleaning will utilize high pressure equipment with chemical injection . After cleaning is completed, <br /> the interior will be thoroughly inspected and disinfected prior to returning to service. <br /> The Company will install an anti-climb device on the access ladder to prevent unauthorized persons from <br /> climbing the tower. <br /> Page 1 of 3 <br /> Copyright 2002 <br /> Utility Service Co. , Inc . <br />
The URL can be used to link to this page
Your browser does not support the video tag.