My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-030
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2016 11:09:17 AM
Creation date
9/30/2015 6:17:03 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
02/04/2003
Control Number
2003-030
Agenda Item Number
11.H.2.
Entity Name
WCG, Inc.
Subject
Utility Operations Center scope of services and schedule
Work Authorization #7
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
2816
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> t' WORK AUTHORIZATION # 7 " <br /> WCG,INC. <br /> SCOPE OF SERVICES AND SCHEDULE <br /> INDIAN RIVER COUNTY UTILITIES DEPARTMENT <br /> UTILITY OPERATIONS CENTER <br /> Project Understanding <br /> Indian River County Utilities (IRCU)has recently purchased 35.80 acres of land, located at the <br /> northwest corner of 43rd Avenue and 41 st Street. The County proposes that the site be used for the <br /> construction of a Utility Operations Center to include water and wastewater operations and <br /> The overall facility is to be designed with a 20-year <br /> equipment and an emergency operations center. <br /> plan horizon allowing for interim growth, as necessary. <br /> Per the County's request, WCG, Inc. is to prepare a Report of the proposed facility and sitace needs, ersonnel, <br /> lopment <br /> dia <br /> improvements. The Report is to includecomplete <br /> sltwo (2)econceptual siaplans and rough order of <br /> equipment, etc.),conceptual building gram <br /> magnitude project costs. <br /> Scope of Services <br /> The Scope of Services for this project consists of four principal tasks-Project Programming, <br /> Conceptual Building Floor Plan, Site Design and Rough Order of Magnitude Project Cost. The <br /> following is a summary of the specific scope requirements: <br /> Task 100 Project Programming <br /> Through meetings(3 minimum)with County Utilities' staff, develop building and site project <br /> program that will become the basis for conceptual site plan design. Upon County approval of the <br /> Project Program,WCG, Inc. will initiate the conceptual floor plan design. <br /> Associated Not-to-Exceed Fee to complete Task 100: <br /> $7,500.00 <br /> Task 200 Conceptual Building Floor Plan <br /> Based upon the approved Project Program, develop a minimum of two(2)conceptual building floor <br /> sical relationships of the various building elements in terms of office <br /> plans that will describe the phy <br /> space,public and County staff circulation,ancillary uses such as break room, restrooms,mechanical <br /> space, etc. The plan will be performance driven based <br /> of a Conceptual Floor P anve use of space while g <br /> iinto consideration future needs. Upon Coun y ection and approval <br /> WCG, Inc. will initiate conceptual site design. <br /> Associated Not-to-Exceed Fee to complete Task 200: <br /> $3,000.00 <br /> Task 300 Site Design <br /> Based upon the approved Project Program,WCG, Inc. will develop a minimum of two (2) <br /> ) sitwill <br /> master plans concepts for County review and comment. Following the County's review, plans <br />
The URL can be used to link to this page
Your browser does not support the video tag.