Laserfiche WebLink
ENGINEER and ENGINEER's Consultants or to the officers, 7. 02 Coordination <br /> directors, partners , employees , agents , and other consultants <br /> and subcontractors of each and any of them arising out of: A. If OWNER intends to contract with others for the <br /> ' performance of other work on the Project at the Site, the <br /> 1 . the preparation or approval of, or the failure to following will be set forth in Supplementary Conditions : <br /> prepare or approve, maps, Drawings , opinions, reports, <br /> surveys, Change Orders, designs, or Specifications; or I . the individual or entity who will have authority and <br /> responsibility for coordination of the activities among the <br /> 2. giving directions or instructions , or failing to give various contractors will be identified; <br /> them, if that is the primary cause of the injury or <br /> damage. 2. the specific matters to be covered by such <br /> ' authority and responsibility will be itemized; and <br /> ARTICLE 7 - OTHER WORK 3. the extent of such authority and responsibilities <br /> will be provided. <br /> 7.01 Related Work at Site B. Unless otherwise provided in the Supplementary <br /> Conditions, OWNER shall have sole authority and responsibility <br /> A OWNER may perform other work related to the for such coordination. <br /> Project at the Site by OWNER's employees, or let other direct <br /> contracts therefore, or have other work performed by utility <br /> owners . If such other work is not noted in the Contract ARTICLE 8 - OWNER'S RESPONSIBILITIES <br /> Documents, then: <br /> 1 .written notice thereof will be given to CONTRAC- 8.01 Communications to Contractor <br /> TOR prior to starting any such other work; and <br /> A. Except as otherwise provided in these General Condi- <br /> 2. if OWNER and CONTRACTOR are unable to tions, OWNER shall issue all communications to <br /> agree on entitlement to or on the amount or extent, if CONTRACTOR through ENGINEER. <br /> any, of any adjustment in the Contract Price or Contract <br /> Times that should be allowed as a result of such other 8. 02 Replacement of ENGINEER <br /> work, a Claim may be made therefore as provided in <br /> ' paragraph 10.05. A. In case of termination of the employment of ENGI- <br /> NEER, OWNER shall appoint an engineer to whom <br /> B. CONTRACTOR shall afford each other contractor CONTRACTOR makes no reasonable objection, whose status <br /> who is a party to such a direct contract and each utility owner under the Contract Documents shall be that of the former ENGI- <br /> (and OWNER, if OWNER is performing the other work with NEER. <br /> OWNER's employees) proper and safe access to the Site and a <br /> reasonable opportunity for the introduction and storage of 8.03 Furnish Data <br /> materials and equipment and the execution of such other work <br /> ' and shall property coordinate the Work with theirs. Unless A. OWNER shall promptly furnish the data required of <br /> otherwise provided in the Contract Documents, CONTRACTOR OWNER under the Contract Documents. <br /> shall do all cutting, fitting, and patching of the Work that may be <br /> required to property connect or otherwise make its several parts 8.04 Pay Promptly When Due <br /> ' come together and properly integrate with such other work. <br /> CONTRACTOR shall not endanger any work of others by A. OWNER shall make payments to CONTRACTOR <br /> cutting, excavating, or otherwise altering their work and will only promptly when they are due as provided in paragraphs 14. 02.0 <br /> cut or alter their work with the written consent of ENGINEER and 14.07.C. <br /> ' and the others whose work will be affected. The duties and <br /> responsibilities of CONTRACTOR under this paragraph are for 8.05 Lands and Easements, Reports and Tests <br /> the benefit of such utility owners and other contractors to the <br /> extent that there are comparable provisions for the benefit of A. OWNER's duties in respect of providing lands <br />and <br /> CONTRACTOR in said direct contracts between OWNER and easements and providing engineering surveys to establish <br /> such utility owners and other contractors. reference points are set forth in paragraphs 4.01 and 4.05. <br /> Paragraph 4.02 refers to OWNER's identifying and making <br /> C. If the proper execution or results of any part of available to CONTRACTOR copies of reports of explorations <br /> CONTRACTOR's Work depends upon work performed by and tests of subsurface conditions and drawings of physical <br /> others under this Article 7, CONTRACTOR shall inspect such conditions in or relating to existing surface or <br /> subsurface <br /> other work and promptly report to ENGINEER in writing any structures at or contiguous to the Site that have been utilized <br /> by <br /> delays, defects, or deficiencies in such other work that render it ENGINEER in preparing the Contract Documents . <br /> ' unavailable or unsuitable for the proper execution and results of <br /> CONTRACTOR's Work. CONTRACTOR's failure to so report 8.06 Insurance <br /> will constitute an acceptance of such other work as fit and <br /> proper for integration with CONTRACTOR's Work except for A. OWNER's responsibilities , if any, in respect to pur- <br /> latent defects and deficiencies in such other work. chasing and maintaining liability and property insurance are set <br /> ' forth in Article 5. <br /> 6706-38392\8/20/03 00700-21 VRB <br />