My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-295
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-295
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 1:17:32 PM
Creation date
9/30/2015 7:01:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2003
Control Number
2003-295
Agenda Item Number
7.Z.
Entity Name
Layne Christensen Company
Subject
South County Water Treatment Plant Wellfield Rehabilitation Phase II
Contract and Specifications
Area
South County Water Treatment Plant
Project Number
38392-151
Bid Number
5102
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3487
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 . 07 CONTRACT TIME <br /> The number of days within which, or dates by which, the work is to be substantially completed and <br /> also complete and ready for final payment (the Contract Time) are set forth in the Bid Form <br /> (Section 003 10) and the Agreement (Section 00530). <br /> 1 .08 LIQUIDATED DAMAGES <br /> Provisions for liquidated damages are set forth in the Agreement (Section 00530). <br /> 1 . 09 SUBSTITUTE OR " OR EQUAL" ITEMS <br /> The Contract, if awarded, will be on the basis of materials and equipment described in the <br /> Drawings or specified in the Specifications without consideration of possible substitute or " or <br /> equal" items. Whenever it is indicated in the Drawings or specified in the Specifications that a <br /> substitute or "or equal' item of material or equipment may be furnished or used by Contractor if <br /> acceptable to Engineer, application for such acceptance will not be considered by Engineer until <br /> after the Effective Date of the Agreement. The procedure for submission of any such application <br /> by Contractor and consideration by Engineer is set forth in Paragraph 6 .05 of the General <br /> Conditions and may be supplemented in the General Requirements, <br /> 1 . 10 BID FORM <br /> A. The Bid Form is included with the Bidding Documents; additional copies may be obtained <br /> from Engineer (or the issuing office) . <br /> B . All blanks on the Bid Form must be completed in ink or by typewriter. <br /> C . Bids by corporations must be executed in the corporate name by the president or a vice <br /> president (or other corporate officer accompanied by evidence of authority to sign) and the <br /> corporate seal must be affixed and attested by the secretary or an assistant secretary. The <br /> corporate address and state of incorporation must be shown below the signature. <br /> D. Bids by partnership must be executed in the partnership name and signed by a partner, <br /> whose title must appear under the signature, and official address of the partnership must <br /> be shown below the signature. <br /> E. All names must be typed or printed below the signature. <br /> F . The Bid shall contain an acknowledgment of receipt of all Addenda (the number of which <br /> must be filled in on the Bid Form). <br /> G. The address and telephone number for communications regarding the Bid must be shown. <br /> 1 . 11 SUBMISSION OF BIDS <br /> Bids shall be submitted at the time and place indicated in the Advertisement or Invitation to Bid <br /> and shall be enclosed in an opaque sealed envelope, marked with Project title (and, if applicable, <br /> the designated portion of the Project for which the Bid is submitted) and name and address of the <br /> Bidder and accompanied by the Bid security and other required documents. If the Bid is sent <br /> 6706-38392\8/20/03 001004 VRB <br />
The URL can be used to link to this page
Your browser does not support the video tag.