Laserfiche WebLink
I <br /> SC- 11 . 01 Cost of the Work <br /> SC- 11 . 01 .A. 5 Delete GC- 11 . 0l .A. 5. e in its entirety. <br /> SC42.01 Change of Contract Price <br /> SC42. 01 .13 .2 Delete the parenthetical phrase in its entiretyfrom GC- 12. 0l. B. 2. <br /> 1 SC- 12 .01 .13 .3 Delete GC- 12. 01. B. 3 in its entirety. <br /> SC- 12 ,0 LC Delete GC-12. 01. 0 in its entirety. <br /> SC- 13 .03 Test and Inspections <br /> SC- 13 . 03 ,B . Delete the first sentence ofparagraph GC- 13. 03. B (up to the colon) in its entirety, and insert <br /> the following sentences in its place: <br /> B . OWNER shall employ and pay for the services of an independent testing laboratory to <br /> perform all initial inspections, tests, or approvals required by the Contract Documents <br /> except those inspections, tests, or approvals listed immediately below. Subsequent <br /> inspections, tests, or approvals required after initial failing inspections, tests, or approvals <br /> shall be paid for by the CONTRACTOR by backcharge to subsequent applications for <br /> payment. The following inspections, tests, or approvals shall be provided by and paid for <br /> by the CONTRACTOR. <br /> 1 . Proctor Testing <br /> 2 . Density Testing <br /> 3 , Leakage Testing <br /> 4 , Hydrostatic Testing <br /> 5 , Bacteriological Testing <br /> ' SC- 14 .02 Progress Payments <br /> SC- 14 . 02 .A.2 Delete paragraph GC-14. 02.A. 2 in its entirety and insert the following paragraph in its <br /> place: <br /> The CONTRACTOR shall make the following certification (Affidavit) on each request for <br /> payment: <br /> "I hereby certify that the labor and materials listed on this request <br /> for payment have been used in the construction of this work and <br /> payment received from the last request for payment has been used to <br /> make payments to all subcontractors, laborers, material men and <br /> suppliers except as listed below." <br /> SC- 14 .02 .B .5 . Add the following sentences at the end ofparagraph GC-14. 02. B. 5: <br /> e, the work for which payment is requested cannot be verified; <br /> f, failure of CONTRACTOR to make proper payments to Subcontractor for labor, materials <br /> or equipment in connection with the Work; <br /> g. OWNER has been required to pay ENGINEER or ENGINEER' s Consultant additional <br /> compensation because of CONTRACTOR delays or rejection of defective Work; or <br /> ' 6706-38392\8/20/03 00800-7 VRB <br />