Laserfiche WebLink
i '. <br /> SECTION 00470 <br /> SCHEDULE OF COST FOR <br /> MAJOR STRUCTURE AND/ OR AREAS OR WORK <br /> i <br /> breakdown to show his allocation among the general items <br /> The Successful Bidder shall submit within 7 days of written request from the OWNER, the following <br /> the BASE BID : which comprise the LUMP SUM PRICE for <br /> Unit Amount Total <br /> 1 . Divisions 0 and 1 <br /> ' a• General Conditions <br /> b • Bonds, Insurance and Indemnification <br /> I ' c• Field Engineering <br /> d • Photographs d© <br /> e. Laboratory Services - <br /> f. <br /> Testing � � <br /> ' <br /> 91 <br /> Miscellaneous Work �o v <br /> 20 . Well No. 1 <br /> ' a• Extend column pipe 20 feet <br /> b • . Telemetry system <br /> c• 3 0 Water level transducer 0 <br /> d . Mechanical seal -9 <br /> e• Miscellaneous work ---�- <br /> 3 _ Well No . 2 <br /> a, . Extend column pipe and shaft 40 feet PT, U 7 (o <br /> b • Telemetry system <br /> ' C. Water level transducer I 2 o o <br /> d • Mechanical seal X70 O <br /> e. Miscellaneous work - ' Ua D <br /> I6 (� <br /> i ' 4. Well No. 3 <br /> a• Well No. 3 Replacement <br /> b • Well No. 3 Abandonment <br /> ! ' c• Telemetry system "� � ' a "7 b <br /> d • Water level transducer -- lit 0�� Do <br /> e • Mechanical seal � 70U <br /> f Blow-off valve installation ---- -�(� y <br /> 37� D <br /> b• Sodding � O <br /> 11 • Fencing p UD <br /> i • Clearing/grubbing <br /> 379sSt �5 <br /> j • Dewatering O <br /> k• Miscellaneous work <br /> 6706-38392\8/20/03 00470 - 1 <br /> � VRB <br />