Laserfiche WebLink
Notes : <br /> ( 1 ) It is understood that the allocations of prices listed above which comprise the LUMP SUM BID <br /> ' for the BASE BID are part of the Proposal and will be used in evaluation of the Successful Bidder's <br /> Bid and are binding upon the CONTRACTOR. <br /> (2) "Miscellaneous Work" included in the above items is: fabricated metals; painting of floors and <br /> ' walls not covered in the architectural or structural; testing, clean-up; and any Work, materials and <br /> equipment that may reasonably be inferred from the Contract Documents as being required to produce <br /> the intended result will be supplied whether or not specifically called for. <br /> END OF SECTION <br /> ' 6706-38392\8/20/03 00470-3 VRg <br />