Laserfiche WebLink
' 1494987 RECORDED IN T"-' RECORDS OF JEFFREY K BARTON , CLERK CT 'TTIT COURT INDIAN <br /> RIVER CO FL , BK : 166 . 1131 , 11 / 24 / 2003 01 : 44 PM <br /> SECTION 00610 <br /> ' PERFORMANCE BOND <br /> Bond /30S104173310 <br /> KNOW ALL MEN BY THESE PRESENTS: <br /> ' — BY MS BOND, we Layne Christensen Comeanv as Principal, <br /> and Travelers Casualty and SuCety Company of Amarirw a corporation, as <br /> Surety, are held and firmly bound unto the County of Indian River, Florida, in the sum of S I x Hundred N 1 nety E i ght <br /> Thousand, Four Hundred Fifty Five and 69/100-- Dollars (5698 . 45LO, amounting to 1255/s of the total <br /> ' — bid price. For the payment of said sum we bind ourselves, our heirs, executors, adminiatrittor� ltd <br /> assigns, lgqmtntly and severally, for the faithful performance of a certain written Contract, dated dna <br /> day of m6w EM69: Z ' 20J5 entered into between the. Principal and the County <br /> of Indian River, for. <br /> Project Name: "SOUTH COUNTY WATER TREATi DU PLANT MMLIXMD <br /> REHABUITA1110N. PHASE TP' <br /> County Project Number: IRC Bid No . 5102 <br /> — Project Address: 1550 Southwest 9* Street <br /> Vero Beach, Florida 32%2 <br /> Project Description: <br /> ' — Well No. l work to include purchase and installation of column pipe to extend pump coiurnp 20 <br /> feet ( 100 foot total depth), purchase and installation of telemetry system and water level <br /> transducers, and replacing packing gland with mechanical seal. <br /> — Well No. 2 work to include purchase and installation of column pipe to extend pump column by 40 <br /> feet (100 foot total depth), purchase and instaliatioa of telemetry system and water level <br /> transducers, and replacing packing gland with mechanical seal. <br /> ' — Well No. 3 work to include construction of new, and abandonment of existing raw water production <br /> well. Well No. 3 modifications also include purchase and installation of discharge piping, air <br /> release valve, isolation valve, blow-0ff valve, telemetry system and water level transducers, and <br /> replacing packing gland with mechanical seal and installation of pressure sustaining valve (to be <br /> provided by OWNER. <br /> Well No. 4 work to include modifications/mpairs to pedestal of existing raw water production well, <br /> purchase and installation of new isolation valve, telemetry system and water level tranducers, air <br /> release valve, blow-off valve, pump and column pipe (100 foot total depth) and installation of <br /> pressure sustaining valve (to be provided by OWNER). Associated work to include performance of <br /> a plumb test and construction of a well pad around entire above ground structure of the well. <br /> Well Nos. 5 and 6 work to inchde purchase and installation of column pipe to extend pump <br /> — columns by 40 feet (100 foot total depth), and installation of pressure. sustaining valves (to be <br /> provided by OWNER, telemetry system and water level transducers, air. release valves and blowoff <br /> valves. Associated work to include performance of a plumb test on both wells. <br /> ' 6706-38392\8/20/03 00610- 1 VRB <br /> ' <br /> CERIMI GNUITIM <br />