Laserfiche WebLink
' BK : 1663 PG : 1137 <br /> SECTION 00612 <br /> PAYMENT BOND <br /> Bona 030s104173310 <br /> KNOW ALL &MN BYTH&SEPRESENTS: Travelers casualty and Surety <br /> BY THIS BOND, We Layne Christen . n rnmpAng as Principal, and Company of America a <br /> corporation, as Surety, are held and firmly bound unto the County of 1"an River, Florida, in the am of <br /> Dollars amounting to 100% of the total bid <br /> price. For the payment of said sum we bind ourselves, our heirs, executors, administrate and assigns, <br /> Jointly and severally, for the faithful performance of a certain written Contract, dated the day of <br /> 200S. entered into between the Principal and the County of indian River, <br /> • Five Hundred Fifty Eight Thousand , Seven Hundred Sixty Four and 55/100 +• ( $ 558, 764 . 55 ) <br /> Project Name: "SOUTH COUNTY WATER TRFLaTMC.'1.Tj' PLANT umt r E n <br /> REHABILTTATTON. PHASE Il" <br /> County Project Number I Rc Bid m 1 m <br /> Project Address: 1550 SoMbiwest 96 Stroet <br /> Vero Basch. Florida 32962 <br /> Project Description: <br /> ' Well No. 1 work to include purchase and installation of column pipe to extend pump cohuum 20 <br /> feet (100 foot total depth), purchase and installation of telemetry system and water level <br /> transducers, and replacing packing gland with mechanical seal. <br /> Well No. 2 work to include purchase and installation of column pipe to extend pump column by 40 <br /> feet 000 foot total depth), Purchase and installation of telemetry system and water level <br /> transducers, and replacing Packing gland with mechanical seal. <br /> - Well No. 3 work to include construction of new, and abandonment of existing raw water production <br /> well. Well No. 3 modifications also include purchase and installation of &w1ulrge piping, air <br /> release valve, isolation valve, blowoff valve, telemetry system and water level transducers, and <br /> f1eplacing Pig gland with mechanical seal and installation of pressure sustaining valve (to be <br /> ' provided by OWNER <br /> Well No. 4 work to include modifications/repaas to pedestal of existing raw water production well, <br /> purchase and installation of new isolation valve, telemetry system and water level tranducers, air <br /> ' release valve, blowoff valve, pump and column pipe (100 foot total depth) and installation of <br /> pressure sustaining valve (to be provided by OWNER). Associated work to include performance of <br /> a plumb test and construction of a well pad around entire above ground structure of the well. <br /> Well Nos. 5 and 6 work to include purchase and installation of column pipe to extend pump <br /> columns by 40 feet (100 foot total depth), and installation of pressure sustaining valves (to be <br /> provided by OWNER, telemetry system and water level transducers, air release valves and blowoff <br /> valves-Associated work to include performance of a plumb test on both Wells. <br /> ' 6706-38392\8/20/03 00612- 1 VRB <br /> A TRUE COPY <br /> ' CERTIFICATION ON LAST PAGE <br /> JX BARTON, CLERK <br />