' c. coordination of the Work with the owners of and drawings relating to a Hazardous Environmental Condition <br /> such Underground Facilities, including OWNER, identified at the Site, if any, that have been utilized <br /> by the <br /> during construction, and ENGINEER in the preparation of the Contract Documents . <br /> d. the safety and protection of all such Under- S . Limited Reliance by CONTRACTOR on Technical <br /> ground Facilities and repairing any damage thereto Data Authorized.• CONTRACTOR may rely upon the general <br /> resulting from the Work. accuracy of the "technical data" contained in such reports and <br /> drawings , but such reports and drawings are not Contract <br /> B. Not Shown or Indicated Documents. Such "technical data" is identified in the <br /> Supplementary Conditions. Except for such reliance on such <br /> 1 . If an Underground Facility is uncovered or "technical data," CONTRACTOR may not rely upon or make <br /> ' revealed at or contiguous to the Site which was not any Claim against OWNER, ENGINEER or any of ENGINEER's <br /> shown or indicated, or not shown or indicated with Consultants with respect to: <br /> reasonable accuracy in the Contract Documents, CON- <br /> TRACTOR shall, promptly after becoming aware thereof 1 . the completeness of such reports and drawings <br /> ' and before further disturbing conditions affected thereby for CONTRACTOR's purposes, including, but not <br /> or perfonning any Work in connection therewith (except limited to, any aspects of the means , methods, <br /> in an emergency as required by paragraph 6. 16.A), techniques, sequences and procedures of construction <br /> identify the owner of such Underground Facility and give to be employed by CONTRACTOR and safety <br /> written notice to that owner and to OWNER and ENGI- precautions and programs incident thereto; or <br /> NEER. ENGINEER will promptly review the Under- <br /> ground Facility and determine the extent, if any, to 2. other data, interpretations, opinions and <br /> which a change is required in the Contract Documents information contained in such reports or shown or <br /> to reflect and document the consequences of the indicated in such drawings; or <br /> existence or location of the Underground Facility. <br /> During such time, CONTRACTOR shall be responsible 3. any CONTRACTOR interpretation of or <br /> for the safety and protection of such Underground conclusion drawn from any "technical data" or any such <br /> ' Facility. other data, interpretations, opinions or information. <br /> 2. If ENGINEER concludes that a change in the C. CONTRACTOR shall not be responsible for any <br /> Contract Documents is required, a Work Change Hazardous Environmental Condition uncovered or revealed at <br /> Directive or a Change Order will be issued to reflect and the Site which was not shown or indicated in Drawings <br /> or <br /> ' document such consequences . An equitable Specitications or identified in the Contract Documents to be <br /> adjustment shall be made in the Contract Price of within the scope of the Work. CONTRACTOR <br /> shall be <br /> Contract Times, or both, to the extent that they are responsible for a Hazardous Environmental Condition created <br /> attributable to the existence or location of any with any materials brought to the Site by CONTRACTOR, <br /> 1 Underground Facility that was not shown or indicated or Subcontractors, Suppliers , or anyone else for whom CON- <br /> not shown or indicated with reasonable accuracy in the TRACTOR is responsible. <br /> Contract Documents and that CONTRACTOR did not <br /> know of and could not reasonably have been expected D. If CONTRACTOR encounters a Hazardous <br /> to be aware of or to have anticipated. If OWNER and Environmental Condition or if CONTRACTOR or anyone for <br /> CONTRACTOR are unable to agree on entitlement to or whom CONTRACTOR is responsible creates a Hazardous <br /> on the amount or extent, if any, of any such adjustment Environmental Condition, CONTRACTOR shall immediately: (i) <br /> in Contract Price or Contract Times , OWNER or secure or otherwise isolate such condition; (ii) stop all <br /> Work in <br /> ' CONTRACTOR may make a Claim therefore as connection with such condition and in any area affected thereby <br /> provided in paragraph 10.05. (except in an emergency as required by paragraph 6. 16); and <br /> (iii) notify OWNER and ENGINEER (and promptly thereafter <br /> 4.05 Reference Points confirm such notice in writing). OWNER shall promptly consult <br /> ' with ENGINEER concerning the necessity for OWNER to retain <br /> A. OWNER shall provide engineering surveys to a qualified expert to evaluate such condition or take corrective <br /> establish reference points for construction which in action, if any. <br /> ENGINEER's judgment are necessary to enable CON- <br /> TRACTOR to proceed with the Work. CONTRACTOR shall be E. CONTRACTOR shall not be required to resume Work <br /> responsible for laying out the Work, shall protect and preserve in connection with such condition or in any affected area <br /> until <br /> the established reference points and property monuments, and after OWNER has obtained any required permits related thereto <br /> shall make no changes or relocations without the prior written and delivered to CONTRACTOR written notice: (i) specifying <br /> ' approval of OWNER. CONTRACTOR shall report to that such condition and any affected area is or has been <br /> ENGINEER whenever any reference point or property rendered safe for the resumption of Work; or (ii) specifying any <br /> monument is lost or destroyed or requires relocation because of special conditions under which such Work may be resumed <br /> necessary changes in grades or locations , and shall be safely. If OWNER and CONTRACTOR cannot agree <br /> as to <br /> ' responsible for the accurate replacement or relocation of such entitlement to or on the amount or extent, <br /> if any, of any <br /> reference points or property monuments by professionally adjustment in Contract Price or Contract Times, or both, <br /> as a <br /> qualified personnel. result of such Work stoppage or such special conditions under <br /> which Work is agreed to be resumed by CONTRACTOR, either <br /> 4.06 Hazardous Environmental Condition at Site party may make a Claim therefore as provided in paragraph <br /> 10.05. <br /> A. Reports and Drawings: Reference is made to the <br /> Supplementary Conditions for the identification of those reports <br /> ' 6706-38392\8/20/03 00700- 11 VRB <br />