Laserfiche WebLink
PG 4 Equipment <br />. EQUIPMENT ESTIMATE <br />c.aicwic,_nvcSrn, of I,,,�Ino <br />#I ITOOLS DESCRIPTION REF RATE TOTAL <br />1 Small Tools 4% Labor Cost $ 744 4% $ 29.76 <br />2 Consumables $1.00 / Labor Hr 24.0 $ 1.00 $ 24.00 <br />3 $ <br />4 Is 53.76 <br />5 <br />6 EQUIPMENT DESCRIPTION QTY UNIT RATE TOTAL <br />7 Pickup Truck Day $ 45.00 $ <br />8 Air Compressor Day $ 45.00 $ <br />9 Welder Day $ 62.00 $ <br />10 Trench Box Day $ 280.00 $ <br />11 Shoring Day $ 30.00 $ <br />12 $ <br />13 $ <br />14 <br />H- <br />15 RENTALS DESCRIPTION QTY UNIT RATE TOTAL <br />16 Excavator Cat 320 Day $ 555.00 $ <br />17 Excavator Cat 325 Day $ 795.00 $ <br />18 Backhoe Rubber Tire Day $ 295.00 $ <br />19 Loader 1 314 to 2 cy Day $ 395.00 $ <br />20 DozerD3 Day $ 332.00 $ <br />21 Roller Vibrating Drum Day $ 298.00 $ <br />22 Concrete Pump 4" line Day $ 876.00 $ <br />23 Compactor diesal Day $ 105.00 $ - <br />24 Crane 35 Ton RT Day $ 880.00 $ <br />25 $ <br />26 <br />27 IFUEL DESCRIPTION Rate REF TOTAL <br />28 1Equipment Fuel 10% Fueled Equipment Cost 10.00% $ $ - <br />29 $ - <br />30 <br />31 <br />32 1EQUIPMENT SUBTOTAL TOTAL <br />33 $ 53.76 <br />34 <br />35�t: : 1 5176 <br />RCP 20 -Repairs at Oxidation Ditch -rev 1 Page 4 <br />