My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-335
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-335
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:21:42 AM
Creation date
10/1/2015 4:03:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
12/15/2009
Control Number
2009-335
Agenda Item Number
12.J.3
Entity Name
Wharton Smith Construction
Subject
Change Order No.4 Expansion to 6 MGD
Area
West Regional Wastewater Treatment Facility
Alternate Name
WWTF
Supplemental fields
SmeadsoftID
10916
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PG 4 Equipment <br />. EQUIPMENT ESTIMATE <br />c.aicwic,_nvcSrn, of I,,,�Ino <br />#I ITOOLS DESCRIPTION REF RATE TOTAL <br />1 Small Tools 4% Labor Cost $ 744 4% $ 29.76 <br />2 Consumables $1.00 / Labor Hr 24.0 $ 1.00 $ 24.00 <br />3 $ <br />4 Is 53.76 <br />5 <br />6 EQUIPMENT DESCRIPTION QTY UNIT RATE TOTAL <br />7 Pickup Truck Day $ 45.00 $ <br />8 Air Compressor Day $ 45.00 $ <br />9 Welder Day $ 62.00 $ <br />10 Trench Box Day $ 280.00 $ <br />11 Shoring Day $ 30.00 $ <br />12 $ <br />13 $ <br />14 <br />H- <br />15 RENTALS DESCRIPTION QTY UNIT RATE TOTAL <br />16 Excavator Cat 320 Day $ 555.00 $ <br />17 Excavator Cat 325 Day $ 795.00 $ <br />18 Backhoe Rubber Tire Day $ 295.00 $ <br />19 Loader 1 314 to 2 cy Day $ 395.00 $ <br />20 DozerD3 Day $ 332.00 $ <br />21 Roller Vibrating Drum Day $ 298.00 $ <br />22 Concrete Pump 4" line Day $ 876.00 $ <br />23 Compactor diesal Day $ 105.00 $ - <br />24 Crane 35 Ton RT Day $ 880.00 $ <br />25 $ <br />26 <br />27 IFUEL DESCRIPTION Rate REF TOTAL <br />28 1Equipment Fuel 10% Fueled Equipment Cost 10.00% $ $ - <br />29 $ - <br />30 <br />31 <br />32 1EQUIPMENT SUBTOTAL TOTAL <br />33 $ 53.76 <br />34 <br />35�t: : 1 5176 <br />RCP 20 -Repairs at Oxidation Ditch -rev 1 Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.