Laserfiche WebLink
COST ESTIMATE <br /> WATER MAIN CONFLICT WITH 15" RCP STORM SEWER <br /> MOVES" WATER MAIN ON THE NORTH SIDE OF 12th STREET TO AVOID CONFLICT W/ DRAINACECULVERT <br /> 6/5/2007, UCP #2967 <br /> UCI' #Account Number AE R 0 <br /> Item No. Bid Item Estimated Unit of Unit Total Unit Total 'TOTAL <br /> Descri tion Vuantil Measure Price Price Price Price COST <br /> 3 IIx+ 71 , <br /> 77 Mobilization, Demobilization & MOT 4.00% % ofConslr. $253.00 $253.00 <br /> U6c Install 8" H . <br /> DPE (SDR I in open-cut Trench Method) Water Main 40 LF 974 389.60 $50.00 $2,000.00 $2,389.60 <br /> 17d Install 8" GV&B East ofOtTsel 1 EA 83190 838.90 $400.00 $400.00 $ 1,23890 <br /> ] Sc Install & Remove 8" Line stop & Res[ain Exist Main 2 EA 1, 141 .56 21283. 12 .$ 1 , 100.00 $2,200.00 $4,483. 12 <br /> 7 Fittin s 0. 10 TONS 3,800.00 350.00 $4,000.00 $400.00 $750.00 <br /> 29b Install 2" Pe Water Main For Temporary By'-pass 50.00 LF 1 .50 75.00 $6.00 $300.00 $375.00 <br /> 241 Install Tem orar 2" Blow-ofP For BY-PASS 2 FA 465.W 930.00 $200.00 $400.00 $ 1 ,330.00 <br /> 22 In tall S 2 F.A 0.00 $ 15090 $300.00 $300.00 <br /> 28 Install Sam le Points I EA 205.22 205.22 $200.00 $200.00 $405.22 <br /> 2'1 Obtain RacL Sample I EA. 0.00 8125.00 $ 125 .00 $ 125.00 <br /> Total Materials $5,071 .84 SubTolal $6,325.00 11 ,649.84 <br /> Labor Subtotal $6,578.00 <br /> G2 Record Drawings $ 1 ,000.00 <br /> 'Iota] Labor $7,578.00 <br /> TOTAL CONST. COST 512,649.84 <br /> Attachment 1 <br /> N o <br /> v <br /> o - <br /> (File] Page 1 N \. <br />