Laserfiche WebLink
WORK AUTHORIZATION DIRECTIVE <br />r No. 2005-018 <br />IRC — SUNTRUST HANK ROSELAND WATER SERVICE <br />DATE OF ISSUANCE: JANUARY 4. 2006 EFFECTIVE DATE: JANUARY 4, 2006 <br />OWNER: Indian River County <br />CONTRACTOR: The Danella Companies Inc <br />CONTRACT: WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT BID NO. 7033 <br />PROJECT: IRC- SuntrUSI Bank Roseland Water Service Instillation <br />COUNTY UTILITY PROJECT NO.: UCP # 2754 CONTRACTOR'S PROJECT NO.: N/A <br />You are directed to proceed promptly with the following work <br />Description: <br />Install about 150 LF of 2" I-IDPE Directional Drill water pipe under sidewalk from water main to bank <br />building, tap main and install water meter box in ROW of US 1. Plumber will make final connection to <br />building and disconnect well service. <br />Purpose of Work Authorization Directive: <br />The installation of the 2" HDPE water main will allow the bank to be served by County water as the <br />plumber does not have equipment to make a Tong bore. <br />Attachments: (List documents supporting work) <br />Exhibit I Cost Estimate <br />Method of determining Contract Price: <br />❑X Unit Prices: Bid Items as established pursuant to Bid No. 7033, and awarded by the Board of County <br />Commissioners on February 15, 2005 to The Danella Companies. <br />❑ Lump Sum <br />❑ Cost of the Work: <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Estimated Labor Cost= <br />$35027.00 <br />Estimated Contract <br />14 days <br />Time: <br />Total Estimated Labor Costs = <br />$3,027.00 <br />ACCEPTED: <br />By: <br />DANELLA <br />COMPANIES <br />Date: L—q— <br />REC MMENDFD: 0IPPROVED: , <br />BA" a <br />ENG INEERr^ lrthu R el Berger <br />l- - o rfi irrtlan:P� <br />Dale: n � <br />C:AD000MB—I NFIDUC-1ALOCALS—IV1einpAnoresG030CRVAA - Wurl< A uthorization Nn. 7.005-018.doc <br />