My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-019
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 9:11:33 AM
Creation date
9/30/2015 8:10:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
01/17/2006
Control Number
2006-019
Agenda Item Number
7.N.
Entity Name
The Danella Companies, Inc.
Subject
installation of water main and meter to bank building
Area
Suntrust Bank- 13800 US Hwy 1, Sebastian, FL
Project Number
UCP #2754
Supplemental fields
SmeadsoftID
4452
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br />r No. 2005-018 <br />IRC — SUNTRUST HANK ROSELAND WATER SERVICE <br />DATE OF ISSUANCE: JANUARY 4. 2006 EFFECTIVE DATE: JANUARY 4, 2006 <br />OWNER: Indian River County <br />CONTRACTOR: The Danella Companies Inc <br />CONTRACT: WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT BID NO. 7033 <br />PROJECT: IRC- SuntrUSI Bank Roseland Water Service Instillation <br />COUNTY UTILITY PROJECT NO.: UCP # 2754 CONTRACTOR'S PROJECT NO.: N/A <br />You are directed to proceed promptly with the following work <br />Description: <br />Install about 150 LF of 2" I-IDPE Directional Drill water pipe under sidewalk from water main to bank <br />building, tap main and install water meter box in ROW of US 1. Plumber will make final connection to <br />building and disconnect well service. <br />Purpose of Work Authorization Directive: <br />The installation of the 2" HDPE water main will allow the bank to be served by County water as the <br />plumber does not have equipment to make a Tong bore. <br />Attachments: (List documents supporting work) <br />Exhibit I Cost Estimate <br />Method of determining Contract Price: <br />❑X Unit Prices: Bid Items as established pursuant to Bid No. 7033, and awarded by the Board of County <br />Commissioners on February 15, 2005 to The Danella Companies. <br />❑ Lump Sum <br />❑ Cost of the Work: <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Estimated Labor Cost= <br />$35027.00 <br />Estimated Contract <br />14 days <br />Time: <br />Total Estimated Labor Costs = <br />$3,027.00 <br />ACCEPTED: <br />By: <br />DANELLA <br />COMPANIES <br />Date: L—q— <br />REC MMENDFD: 0IPPROVED: , <br />BA" a <br />ENG INEERr^ lrthu R el Berger <br />l- - o rfi irrtlan:P� <br />Dale: n � <br />C:AD000MB—I NFIDUC-1ALOCALS—IV1einpAnoresG030CRVAA - Wurl< A uthorization Nn. 7.005-018.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.