My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-003
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 9:49:32 AM
Creation date
9/30/2015 8:07:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/03/2006
Control Number
2006-003
Agenda Item Number
7.R.
Entity Name
GeoSyntec Consultants, Inc.
Subject
UST Closure,Source, Removal & AST installation-Work Auth. No FR0737
Area
South County RO Water Plant
Supplemental fields
SmeadsoftID
4435
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE OF PRICES - SOUTH COUNTY RO PLANT <br /> Bid Item <br /> # Item Description Extended <br /> 1 General <br /> Unit Unit Rat jantity Cost <br /> Provision of 40 Hr OSHA Training Certificates for Site Workers and Documentation of PSSC <br /> 1 . 1 license LS -3500 1 $ 3, 500.00 <br /> 1 . 2 Mobilization to Site LS 2500 4 $2, 500 .00 <br /> 1 . 3 Demobilization LS I2500 1 $2, 500.00 <br /> 1 . 4 Detailed Project Schedule LS 750 t $ 750. 00 <br /> 2 Dewatering <br /> 2 . 1 Installation of Dewaterin System Extraction Points, Headers, Pumps) LS 7525 t 1 $ 7, 525 .00 <br /> 2. 1 Removal of Dewatering System Extraction Points, Headers, Pumps) LS 350Q 1 $3, 500 . 00 <br /> 2. 3 operations of Dewatering Pum Fuel , Labor, etc. Day 47S 20 $9 , 500. 00 <br /> 2.4a Provision , installation, and o oration of s ra irri ation s stem for treated effluent disposal LS 2845 1 $2 <br />845 . 00 <br /> 2. 4b Provision of dischar a to NPDES outfall u to 300 It from treatment equiLS 2208 1 ' $20298 .00 <br /> 3 Groundwater Treatment S stem <br /> Installation of Dewatering Treatment System (Includes airstripper, frac tank transfer pump and <br /> generator)( (does not include any additional costs for operation of dewatering and groundwater <br /> 3 . 1 treatments stems)(Treatment for petroleum hydrocarbons only LS 8300 1 ` $8 300. 00 <br /> 3 . 2 Removal of Dewatering Treatment S stem LS 3750 1 $31750. 00 <br /> Operations of Fluid Treatment Equipment (Fuel, Labor, etc. ) ( Includes Frac tank . airsnpper, <br /> 3 . 3 transfer pump andgenerator) nail 675 20 $ 13, 500 . 00 <br /> 4 Site Work <br /> 6, 000 Gallon UST, concrete, and associated product lines closure and disposal. ( Does not <br /> 4 . 1 include any deadman or other subgrade anchorin devices) LS_ $753 i $81755. 00 <br /> 4 . 2 Excavate/stockpile/transport debris/soil to IRC Class I Landfill ( Based on 933 tons) LS MRS 1 $230325.00 <br /> Proper disposal of any sludges and/or petroleum . (Non -haz only , required anyldcal supplied by <br /> 4 . 3 customer) Drum 750 2 $ 1 $ 00. 00 <br /> Hand or vacuum excavation work along utility corridor ( Based on 40 cu yd estimate . additional <br /> excavation at 350 . 00 per cu yd ) (does not include any additional costs for operation of <br /> 4 .4 dewatering and groundwater treatments stems) LS 13770 1 $ 13, 770 . 00 <br /> 4 . 5 180 pounds of ORC provision and a lication LS 25 180 $4 , 500.00 <br /> 4 . 6 Procurement of and placement of certfied backfill for site restoration Cu. Yd . 25 7 7.5 $ 192437. 50 <br /> 4 . 1 Access roadwa restoration match existin LS 28385 1 $28, 365. 00 <br /> 4. 8 Final grading , Sod Planting monitoring well manhole/concrete pad LS 3755 1 $3 , 755 . 00 <br /> Additional Excavation and Stockpile Beyond Defined Volume (does not include any additional <br /> 4. 9 costs for operation of dewatering andgroundwater treatments stems) ton 10 t <br /> 4 . 10 Additional Trans rt of Contaminated Soil to IRC Class I Landfill Beyond Defined Volume ton 20 1 <br /> 4 . 11 Unit cost credit for excavation and disposal of less than 933 c ton 15 <br /> 5 ASTS stem <br /> Permitting and installation of (does not include subgrade for tank area concrete slab for AST , <br /> CMU wallsfooter or tie ins) , temporary piping, final piping for new and proposed AST and <br /> operational checkout of 6, 000-gallon ConVault AST System ( Customer will supply 4 sets of <br /> 5 . 1 sealed en ineered drawm s for permitting_ ) LS 42405 $42, 405. 00 <br /> 6 Other <br /> 6. 1 Remove and re-install vent hoods on generator building- LS 6500 $6P500. 00 <br /> LUMP SUM TOTAL <br /> $212,780.50 <br /> PRBD will take great care in excavating in areas as instructed by Geosyntec and PRBD will call <br /> for a utility clearance but we will not be responsible to repair any utilities encountered <br /> Notes: <br /> 1 . LS Items to be reimbursed following completion of specific tasks in accordance with the specifications. I <br /> 2. Unit rate items to be reimbursed in accordance with the actual units completed. Costs for additional excavation volumes , transport, and <br /> disposal <br /> (items 4 . 9 and 4 . 10) will not be reimbursed unless PRIOR WRITTEN APPROVAL is provided by GeoSyntec. <br /> 3. SUBCONTRACTOR is responsible for soil/debris transportation to IRC Class I Landfill, disposal fees will be directly billed to IRC Utilities <br />. <br /> 4. The SUBCONTRACTOR bid shall include written assurance that SUBCONTRACTOR will comply with the applicable trench safty standards . <br />
The URL can be used to link to this page
Your browser does not support the video tag.