My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-003
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 9:49:32 AM
Creation date
9/30/2015 8:07:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/03/2006
Control Number
2006-003
Agenda Item Number
7.R.
Entity Name
GeoSyntec Consultants, Inc.
Subject
UST Closure,Source, Removal & AST installation-Work Auth. No FR0737
Area
South County RO Water Plant
Supplemental fields
SmeadsoftID
4435
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants <br /> SUBCONTRACTORS <br /> Total ;$ 650 <br /> Total <br /> Laboratory Unit Unit Cost Task 2 Task 3 Units Cost <br /> BTEX/MTBE by 8260B (water) each $ 60 10 10 $600 <br /> BTEX/MTBE by 8260B ( soil ) each $65 10 10 <br /> IIPAHs by 8310 (water) each $ 115 10 10 $ 19150 <br /> PAHs by 8310 ( soil) each $ 125 10 10 $ 1 , 250 <br /> TRPH each $ 88 2 2 $ 176 <br /> Gasoline and kerosene analytical group each $ 340 2 2 $ 680 <br /> RCRA Metals ( 8 ) each $ 130 2 2 $260 <br /> TCLP Extraction each $ 77 2 2 $ 154 <br /> Laboratory Subtotal $4 , 920 $4 , 920 <br /> Total Laboratory Costs Markup * 7 % $59264 1$6 � 500 <br /> oa <br /> UST Contractor Unit Unit Cost Task 2 Task 3 nits <br /> General <br /> Training Certification each 1 $ 300 <br /> Mobilization each 1 $ 6 , 500 Demobilization each 1 $ 1 , 000 Project Schedule ea <br />ch 1 $ 500 <br /> Dewatertng <br /> Dewatering System Installation each 1 $ 6 , 500 $ 69500 <br /> Dewatering System Removal each 1 $ 19200 $ 19200 <br /> Operation of Dewatering Pump each 1 $2 , 100 $29100 <br /> Provision and Operation of Spray Irrigation S each 1 $41000 $4 ,000 <br /> Groundwater Treatment S stem <br /> Installation of Dewatering Treatment System each 1 $ 16 , 500 $ 16 , 500 <br /> Removal of Dewatering Treatment System each 1 $ 1 , 500 $ 1 , 500 <br /> Operation of Fluid Treatment Equipment each 1 $ 10, 000 $ 10 , 000 <br /> Site Work <br /> 6000 gallon UST closure each 1 $ 7 , 800 $ 75800 <br /> Excavate/stockpile/dispose soil to IRC landfil each 1 $205526 $209526 <br /> Disposal of sludge/petroleum each 1 $ 900 $ 900 <br /> Hand or vacuum excavation work each 1 $ 3 , 800 $ 39800 <br /> 180 lbs of ORC purchase/application each 1 $2 , 880 $25880 <br /> Procurement/placement of backfill each 1 $ 17 , 580 $ 179580 <br /> Final grading, sod, monitoring well/pad each 1 $21400 $2 , 400 <br /> Access roadway restoration each 1 $ 75800 $ 7 , 800 <br /> T System <br /> Permitting/installation each 1 $ 39 , 700 $ 39 , 700 <br /> UST/AST Work Subtotal $ 113 , 786 $ 39 , 700 $ 153 ,486 <br /> Construction Markup (7 % ) $ 7 , 965 $29779 $ 101744 <br /> Subcontractor Subtotal $ 121 751 $429479 $ 164, 230 <br /> Construction Expenses Contingency ( 15 %) $ 18 ,263 $ 6 , 372 $ 24635 <br /> , <br /> UST Contractor Totals $ 1401014 $48 , 851 $ 188 , 865 <br /> TOTAL $ 145,278 $489851 $ 194, 129 <br /> R050084/XR05088 Page 4 of 5 <br /> 05 . 12 . 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.