My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-162
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 9:47:57 AM
Creation date
9/30/2015 8:43:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
05/10/2005
Control Number
2005-162
Agenda Item Number
11.J.1
Entity Name
Danella Companies, Inc.
Subject
Work Authorization Directive Bridge Construction Project S
Potholes
Area
43rd. Ave. Old Dixie Hwy. So. Relief Canal 5th St. SW Lateral C
Project Number
2005-007
Bid Number
7033
Supplemental fields
SmeadsoftID
4906
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
err ..r" <br /> � J <br /> WORK AUTHORIZATION DIRECTIVE / � j <br /> No . 2005-007 05 - <br /> 43RD AVENUE & OLD DIXIE HWY, @ SO . RELIEF CANAL & 5T" ST. SW @ LATERAL C <br /> BRIDGE CONSTRUCTION PROJECTS = POTHOLES <br /> DATE OF ISSUANCE : May 2005 EFFECTIVE DATE May 2005 <br /> OWNER: Indian River County <br /> CONTRACTOR: The Danella Companies, Inc . <br /> CONTRACT : WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br /> AND MISCELLANEOUS LABOR CONTRACT BID NO , 7033 <br /> PROJECT : Locate utilities and depths for relocation of utilities with bridge construction <br /> COUNTY UTILITY PROJECT NO . : UCP #2583 CONTRACTOR ' S PROJECT NO . : N/A <br /> COUNTY W.I.P . No . 471 - 169000 R&R Fund <br /> You are directed to proceed promptly with the following work: <br /> Description: <br /> Excavate 26 potholes as directed by Engineer on 43`d Ave . and Old Dixie hwy at South Relief Canal and 50' St. SW <br /> at Lateral C. A 4" PVC pipe is to be placed on top of utility pipe and cut off one inch above ground surface for <br /> survey elevations to be taken by County. Contractor is also to take depth from ground to top of pipe . <br /> Purpose of Work Authorization Directive : <br /> To establish depths of utilities for relocation with bridge construction <br /> Attachments : (List documents supporting work) <br /> Attachment 3 Cost Estimate <br /> Method of determining Contract Price : <br /> ❑x Unit Prices : Bid Items as established pursuant to Bid No. 7033 , and awarded by the Board of County <br /> Commissioners on March 15 , 2005 to the Danella Companies, Inc . <br /> ❑ Lump Sum <br /> ❑ Cost of the Work <br /> The Cost of Labor, Contingency and Contract Time is summarized below: <br /> Estimated Labor Cost = $ 55512 . 00 Estimated Contract Time : 30 days <br /> Total Estimated Labor Costs = $ 5 , 512 . 00 <br /> •p 1, <br /> ACP TE REC'OMME ED : /� APPRO <br /> By <br /> CONTRACTOR ENGINEE8 �,, " lp, a ; <br /> z L T1Ciat',� Low�t�aea ;` <br /> Date : +� Date : 3 ' �/ Date : F• �`` � . • • " <br /> ►eat'. ; . <br /> Attachment 4 <br /> F1ti� ities\UTILITY - ENGINEERING\Projects - Utility Construction Permits\IRC - Utility Potholes on 43rd Ave, Old Dixie Hwy at S . Relief <br /> Canal , 5th Ave SW at Lat. C\Work Authorization No. 2005 -007 Potholes Attachment 4 .doc9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.