My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-302
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 12:13:26 PM
Creation date
9/30/2015 9:05:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
09/06/2005
Control Number
2005-302
Agenda Item Number
11.J.1
Entity Name
The Danella Companies,Inc.
Subject
Work Authorization #2005-008 Force Main Replacement
Area
Schumann Dr. Balley Drive to Caprol Lane
Project Number
2627
Bid Number
7033
Supplemental fields
SmeadsoftID
5155
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nook <br /> � � J • I <br /> WORK AUTHORIZATION DIRECTIVE <br /> No. 2005-008 5 G' <br /> IRC — Schumann Dr. Force Main Replacement Project from Bailey Drive to Caprol lane <br /> DATE OF ISSUANCE : July 19 , 2005 EFFECTIVE DATE : July 19 , 2005 <br /> OWNER: Indian River County <br /> CONTRACTOR: The Danella Companies Inc <br /> CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br /> AND MISCELLANEOUS LABOR CONTRACT, BID NO . 7033 , AWARDED <br /> March 15 2005 <br /> PROJECT : Replace 3 " Force Main on Schumann Drive with 4" HDPE Directional Drill <br /> COUNTY UTILITY PROJECT NO . : UCP #2627 CONTRACTOR ' S PROJECT NO . : N/A <br /> COUNTY W . I.P . No . 471 - 169000 R&R Fund <br /> You are directed to proceed promptly with the following work: <br /> Description: <br /> The construction of 4" HDPE force main and any necessary restoration to replace existing Transite force main and <br /> reconnect existing single service . <br /> Purpose of Work Authorization Directive : <br /> To replace force main that has been shown to be unreliable and subject to multiple failures . <br /> Attachments : (List documents supporting work) <br /> Method of determining Contract Price : <br /> x❑ Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Board of County <br /> Commissioners on March 15 , 2005 to The Danella Companies, Inc . <br /> ❑ Lump Sum <br /> ❑ Cost of the Work <br /> The Cost of Labor, Contingency and Contract Time is summarized below: <br /> Estimated Labor Cost = $ 80,252 . 60 Estimated Contract Time : 30 days <br /> Total Estimated Labor Costs= $ 80,252 . 60 <br /> ACCEPT RECOMMENDED : � flVED : <br /> B By. �GG!Z`�� 13 <br /> By: <br /> The Da la Companies Gordon E. Spar , P . E . ,tTmas S`. Lowther <br /> ; 1 ' ', CH TMAN <br /> Labor Contractor Environmental Engineer ... UI <br /> k <br /> Date : 6 � L9 . o a` Date : 6 DaYe': 00 .7 { 1 E " 1 � <br /> Attachment 3 <br /> C :\DOCUME— I \NFIDUC—I \LOCALS—I \Temp\notes6030C8\789011 I .doc9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.