WORK AUTHORIZATION DIRECTIVE <br /> No, 2007-002 <br /> LATERAL J AT OSLO RD, EXISTING 18" OVERHEAD FM RELOCATION TO <br /> 20" DIRECTIONAL DRH.L UNDER CANAL PER REQUEREWNTS OF IRFWCD FOR PHASE I WEST <br /> W WTF 24" TRANSMISSION FORCE MAIN PERMIT U4)6-50 <br /> DATE OF ISSUANCE: April 2007 EFFECTIVE DATE: April 2007 <br /> OWNER: Indian River County <br /> CONTRACTOR: Underground Utilities, Inc. <br /> CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / <br /> EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT BID NO 2007026 Febr�ary <br /> 6. 2007 <br /> PROJECT: Construct about 800 feet of 8" water main with two fire hydrants <br /> COUNTY UTILITY PROJECT NO.: UCP #2899 CONTRACTOR'S PROJECT NO. : N/A <br /> COUNTY W.I.P. No. 472-169000-06531 <br /> You are directed to proceed promptly with the following work: <br /> Description: <br /> Construct about 400 linear feet of 20" HDPE force main with appurtenances for connection to existing <br /> force main <br /> Method of determining Contract Price: <br /> ❑X Unit Prices: Bid Items as established pursuant to Bid No 2007026, and awarded by the Board of <br /> County Commissioners on February 6, 2007 to Underground Utilities, Inc. <br /> ❑ Lump Sum <br /> ❑ Cost of the Work <br /> The Cost of Labor, Contingency and Contract Time is summarized below: <br /> Estimated Labor Cost = $ 115,960.00 Estimated Contract 60 days <br /> Time: <br /> Total Estimated Labor Costs = $ 115,960.00 <br /> ACCEPTED: RECO NDEtlPPROVED: <br /> By: By: v �Z $y. _ <br /> Underground Utilities, Inc. Gordon E. Sparks, E. Gary CCWheeler <br /> Utilities Labor Contractor Environmental Engineer Clr3innan, BCC <br /> Date: 7 vS ` o7 Date: l —S - J � Dater "04/17 /07 <br /> CADncu tc and Set inmT�ree Ftench\Mv DncumentclA - Work Authnrirffifon No. 2007-0 IAM9 <br />