My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-271
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2016 1:19:27 PM
Creation date
9/30/2015 9:01:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
08/09/2005
Control Number
2005-271
Agenda Item Number
11.J.1
Entity Name
The Danella Companies
Best Car Wash
Subject
Work Authorization Directive #2005-010 Force Main Reloction
Area
US 1 and Indian River Blvd.
Project Number
UCP#2665
Bid Number
7033
Supplemental fields
SmeadsoftID
5120
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br /> No. 2005-010 <br /> IRC — BEST CAR WASH FORCE MAIN RELOCATION ON US 1 n/o INDIAN RIVER BLVD, <br /> DATE OF ISSUANCE : August 1 , 2005 EFFECTIVE DATE August 1 , 2005 <br /> OWNER: Indian River County <br /> CONTRACTOR : The Danella Companies Inc . <br /> CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br /> AND MISCELLANEOUS LABOR CONTRACT BID NO , 7033 <br /> PROJECT : IRC — Best Car Wash Force Main Relocation on US 1 north of Indian River Blvd. <br /> COUNTY UTILITY PROJECT NO . : UCP # 2665 <br /> CONTRACTOR ' S PROJECT NO . : N/A <br /> You are directed to proceed promptly with the following work: <br /> Description : <br /> Install about 1000 feet of 4" HDPE Directional Drill pipe along the east side of the ROW of US 1 from <br /> the point where it enters the ROW from the car wash to an existing 3 " force main on the south side of 6"' <br /> Avenue . The new force main shall be installed about 3 feet horizontally from and within the east ROW <br /> line of US 1 and maintain a depth of at least 10 feet, except where it comes up at Hale Groves. Reconnect <br /> the 2 " force main from Hale Groves to the new 4" force main, install a 4" GV&B at the connection point <br /> and maintain a minimum 3 feet of cover at this point . Then continue north to 6"' Avenue at a depth of 10 <br /> feet until it comes up at 6th Avenue . Install a 4" GV&B at the south car wash connection point. <br /> Pumose of Work Authorization Directive : <br /> The installation of the 4 " force main will replace existing 2 " and 3 " force main that conflicts with <br /> pavement and drainage installation on US 1 by the FDOT. <br /> Attachments : (List documents supporting work) <br /> Exhibit 2 Cost Estimate <br /> Method of determining Contract Price : <br /> 0 Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Board of County <br /> Commissioners on February 15 , 2005 to The Danella Companies . <br /> ❑ Lump Sum <br /> ❑ Cost of the Work: <br /> The Cost of Labor, Contingency and Contract Time is summarized below : <br /> Estimated Labor Cost = $215999 . 52 Estimated Contract 7 days <br /> Time : <br /> Total Estimated Labor Costs = $211999 . 52 <br /> ACCEPT RECO MENDED : APPROV,FD; ; <br /> By : By Jci�� By : <br /> y �, ENGINEER DIRL OR Date : <br /> Date : ' zoo © Date : 7, 7 ' �� <br /> APPROVED : Mbit 3 <br /> BY <br /> BCC App�prr {? d y C \pOCUME— I \NFIDUC— ITOCALS— I \Temp\notes6030CKWork Authorization No. 2005-010 Exhibit 3 .doc <br /> 08 - 09 = 2005 • • . . • <br />
The URL can be used to link to this page
Your browser does not support the video tag.