Laserfiche WebLink
at <br /> Indian River CountDeparmerit of Utilities <br /> COST ES"I'MATE <br /> Project: Racket Water Service Installation at 2015 Oslo Road <br /> UCP #2955 <br /> I6-Jan-06 <br /> Rid Item Estimated llna Unit Total Labor 6lateriul unit }tneriv Total <br /> Item No Description floi Meamre Price Yrife Pon Prire Price <br /> 63 Mobilization I 0.03 $146.64 <br /> 64 Demobilization 1 0.01 $36.66 <br /> 65 Maintenance of ia0ic I ODI $36.66 <br /> Ola Install2" PE Water Service Line in 4" Sleeve 190 EA 490 $799.00 0.51 8670 <br /> 04a Install 4" lIDPE Directional Drill Pipe Sleetre 160 LF 14.00 52,240.00 2.97 47520 <br /> 24 Install Meter Box i EA 100.00 $ 100.00 <br /> 63.50 63.50 <br /> $0.00 0.00 <br /> 23 Policies 2 EA 200,00 $400.00 000 <br /> $0.00 0.00 <br /> 53 ROW Grading100 SY 1 .00 5100.00 0,00 <br /> 73a Lawn Restoration with Sod 10 SY 2 90 $27.00 2, 17 2170 <br /> Subtotal Water Labor L $3,666A0 <br /> Total Labor 53.88596 <br /> Total .Materials <br /> S647. 10 <br /> TOTAL ESTIMATED COST $4,533.06 <br /> Exhibit 1 <br />