My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-098
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 12:18:18 PM
Creation date
9/30/2015 10:39:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
03/13/2007
Control Number
2007-098
Agenda Item Number
11.J.2
Entity Name
Underground Utilities, Inc.
Subject
Work Authorization Directive No.2007-001
Water Main Extension
Area
Operations Center on 43rd. Ave.
Project Number
UCP 2890
Bid Number
2007026
Supplemental fields
SmeadsoftID
6219
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br /> No. 2007-001 <br /> OPERATIONS CENTER ON 43RD AVENUE WATER MAIN EXTENSION <br /> DATE OF ISSUANCE: March 2007 EFFECTIVE DATE : March 2007 <br /> OWNER: Indian River County <br /> CONTRACTOR: Underground Utilities, Inc. <br /> CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / <br /> EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2007026, February <br /> 612007 <br /> PROJECT: Construct about 800 feet of 8" water main with two fire hydrants <br /> COUNTY UTILITY PROJECT NO. : UCP 42890 CONTRACTOR' S PROJECT NO. : N/A <br /> COUNTY W. I .P. No. N/A <br /> You are directed to proceed promptly with the following work: <br /> Description: <br /> Construct about 800 feet of 8" water main with two fire hydrants <br /> Method of determining Contract Price: <br /> El Unit Prices: Bid Items as established pursuant to Bid No 2007026, and awarded by the Board of <br /> County Commissioners on February 6, 2007 to Underground Utilities, Inc . <br /> ❑ Lump Sum <br /> ❑ Cost of the Work <br /> The Cost of Labor, Contingency and Contract Time is summarized below: <br /> Estimated Labor Cost = $22,378.00 Estimated 30 days <br /> Contract Time: <br /> Total Estimated Labor Costs = $22,378.00 <br /> ACCEPTED: RECOMMENDED: APPRCgVED: 7t' <br /> By: — �f—�c . B By <br /> Underground Utilities, Inc . Cri!fi j / L <br /> ENGINE R G C Wh of r; <br /> Ch rrmep, -9CC <br /> Date: 3 — S— 0 7 <br /> '' IWr: <br /> Date: Date : 03 / 13 / 07 <br /> Attachment 2 <br /> C\Documents and Settings%George French\Local Settings\Temporary Intemet Fi1es%ContenCiE5\QHDZ7L151A - Work Authorization No. 2007- <br /> 001 doc9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.