My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-391
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-391
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 11:33:26 AM
Creation date
9/30/2015 11:27:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
11/13/2007
Control Number
2007-391
Agenda Item Number
11.J.3
Entity Name
Underground Utilities,Inc.
Subject
Vista Royal Fire Hydrant Replacement Project
Area
Vista Royal
Project Number
UCP #3021
Bid Number
2007026
Supplemental fields
SmeadsoftID
6687
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVES, 067 - 3 y <br /> No. 2007-013 l <br /> VISTA ROYAL FIRE HYDRANT REPLACEMENT PROJECT <br /> DATE OF ISSUANCE: November 2007 EFFECTIVE DATE: November 2007 <br /> OWNER: Indian River County <br /> CONTRACTOR: Underyround Utilities, Inc . <br /> CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / <br /> EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT BID NO 2007026 Febrtrary <br /> 6, 2007 <br /> PROJECT: Replace deteriorated fire hydrants that are classified as unusable <br /> COUNTY UTILITY PROJECT NO.: UCP #3021 CONTRACTOR' S PROJECT NO. : N/A <br /> COUNTY W.LP. No. 471 - 169000-08501 . <br /> You are directed to proceed promptly with the following work: <br /> Description: <br /> Replace 30 fire hydrants and gate valves at the direction of Utilities Operations personnel <br /> Method of determining Contract Price: <br /> ❑X Unit Prices: Bid Items as established pursuant to Bid No 2007026, and awarded by the Board of <br /> County Commissioners on February 6, 2007 to Underground Utilities, Inc. <br /> ❑ Lump Sum <br /> ❑ Cost of the Work <br /> The Cost of Labor, Contingency and Contract Time is summarized below: <br /> Estimated Labor Cost = $ 107,764. 80 Estimated Contract Time: 60 da s <br /> Total Estimated Labor Costs = $ 107,764.80 <br /> ACCEPTED: RE4ENG <br /> ED- APPROV�v <br /> BY � Y B <br /> Underground Utilities, Inc. INEER <br /> 4thairman, <br /> BCCC. Wheeler, <br /> Date: /� - 3/ - O7 07 Date: <br /> Dar-IJISID-7 <br /> Attachment 3 <br /> C:\Documents and Settings\George FrenchTocal Settings\Temporary Intemet Fi1es\Content.IE5\02SCBMT3\A - Work Authorization No. 2007- <br /> 013 Attachment (1).doc9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.