Laserfiche WebLink
Indian River County Department of Utilities <br /> COS"r ESTIMATE <br /> Project IRC - Vista Royal Fire Hydrant Replacement Project <br /> Cost Estimate for Work Authorization No. 2007-013 to Underground Utilities, Inc. <br /> UCP 41021, WIP 4471-169000.08501 <br /> 22-0et-0] <br /> Bid Item Estimatd eUnit of Unit Total Labor Unit Total Labor Maeriel u"h Mnenel <br /> Item No Description issississisuami Measure Price A' Price A" Price B"" Price B'. Pritt Prue <br /> 63 Mobilization. Demobilization, MOT 0.043 768.00 O.U] 904925 <br /> Olc Install 6" PVC Water Main 500 LF U400.004,000, <br /> ,000.00 7.00 3,500.00 53,68 1 ,840.08 <br /> 09 Install M1 Restraint Fittings 5 TON ,000.00 I ,fifi500 8.125.00 $2,50000 12500.00 <br /> Its Install Dl Wet Ta w,' GV&D6" Xfi" and Ta Mein 32 F.A .800.00 1 ,000.00 32,000.00 51,065.05 34081 .60 <br /> I ]c Install 6" Gate Valve & Box 10 EA ,000.00 435.00 4,}5000 8541 .82 5,418.20 <br /> 19b Install FireHdrant Assembl w/6" Gmc Valve & Tec 32 Ea 8,400.00 2,00000 64,00000 $205662 65,811 .94 <br /> 22 Test Holec'Potholcs b0 EA .000.00 220.00 13,200.00 <br /> 2]b Bacterial Sam le/ra$en to Lab I"ur Testin 12 EA 1 ,500.00 200.00 2,400.00 $184.69 2,21628 <br /> 59a LawneROW Restoration To soil & Bahia Sud) ]50 SY ,500.00 2,00 1,500.00 $2.50 1 ,97500 <br /> Subtotal Labor Cost $94,200.00 129,2]5.00 <br /> Subtotal Labor Cost with Item 63 g97,968.o0 I}8,12415 <br /> Total Matcrnals <br /> 23142.92 <br /> IRCDUS Porte Account 0. 10 89796.80 13 932,43 <br /> Total Labor Coo $ 109,764.80 153 156.68 <br /> TOTAL ESTIMATED COSI $231 ,507.72 $275,899.60 <br /> TOTAL F,STIMA"rED LABOR COST $107,764.80 $152,156.68 <br /> • Undei9round Utilities , xnc . <br /> ,• Denko Coniarn ion Cars <br /> Attachment 2 <br />