Laserfiche WebLink
IN Ardaman & Associates , Inc . <br /> W00% January 16 , 2007 <br /> Proposal File No. 07-64-3135 <br /> 4? Y j� Y F� ` lid ` � ti Ri a <br /> Indian River CountyL Oe <br /> " <br /> Board of County Commissioners <br /> Engineering Division <br /> 1840 25" Street <br /> Vero Beach , Florida 32960-3365 <br /> Attention : Ms . Michelle A . Gentile <br /> Subject : Proposal for Subsurface Soil Exploration and <br /> Geotechnical Engineering Evaluation <br /> 16`hStreet Bridge at 74th Avenue <br /> Indian River County, Florida <br /> Ladies and Gentlemen : <br /> As requested , we are pleased to present the following proposal for conducting a subsurface soil <br /> exploration and geotechnical engineering evaluation for the subject project. This proposal presents <br /> our approach to the project which was discussed with your project structural engineer, Bridge <br /> Design Associates , Inc. and includes an estimate of field exploration and laboratory testing <br /> quantities as well as geotechnical engineering services needed for the evaluation of the data <br /> obtained and preparation of a report . <br /> We understand that the project will consist of replacing the existing 16" Street bridge crossing over <br /> Rangeline Canal with a new bridge supported on prestressed concrete piles . <br /> The following summarizes our proposed scope of work and associated fees for conducting the <br /> subject exploration . <br /> FIELD EXPLORATION <br /> As requested , our field program will include conducting two Standard Penetration Test ( SPT) <br /> borings , one at each end of the proposed bridge over Rangeline Canal to a depth of 60 feet. The <br /> borings may be completed to shallower (or deeper) depths depending on the soil conditions <br /> encountered during the performance of the borings . The SPT borings will be drilled using a <br /> procedure similar to the Standard Penetration Test outlined in ASTM D- 1586 . The borings will be <br /> sampled at 18-inch or 24-inch intervals to 10 feet deep and at 5-foot intervals below 10 feet. Each <br /> sample will be removed from the sampler in the field and then examined and visually classified by <br /> our crew chief. Representative portions will be sealed and packaged for transportation to our <br /> laboratory for further analysis as required . Water level observations will be made in the boreholes <br /> during the drilling operation . <br />