Laserfiche WebLink
• Equipment Lease — Monthly Rate <br /> 1 . ISCO 4150 Flowlogger (+ 1 replacement) $275.00 per month <br /> 2. 3700 Portable Sampler (+ 1 replacement) $275.00 per month <br /> 3. Miscellaneous equipment lease: $ 75.00 per month <br /> To include : shelters, batteries, site hardware, <br /> wire, PVC, solar panel (if in a remote location) <br /> dessicant, pest control, cleaning agents and <br /> their unlimited replacements during the time <br /> period of this project. <br /> • Autosampling Events and Calibration Visits — Per Event $450.00 per event <br /> To remove, package in ice, and transport water samples to <br /> the county ' s lab courier pick up point. All chain of custody <br /> documentation completed and executed on time . Electronic <br /> autosampling discharge data processed to table and graph <br /> formats for lab results to be incorporated into the data for <br /> loading computation. Autosampler will be recalibrated and <br /> enabled for the next sampling event. The calibration visits <br /> covers up to a one hour visit. If a visit extends beyond one <br /> hour, the hourly rate of $ 75 . 00 applies in '/z hour increments . <br /> • Miscellaneous Work — Hourly Rate $75.00 per hour <br /> To include : surveying, diving, and lab courier (timely <br /> delivery of samples to the lab or to the courier when <br /> required; sample kits can be sent by any reliable shipper <br /> if acceptable by the County ' s Project Manager.) <br /> • Work Not Covered - TBD <br /> Heavy equipment support/operation, ditch/channel <br /> maintenance, any type of aquatic vegetation control, and any/or <br /> work not specified in this proposal . The county will provide <br /> this support (manpower and equipment) when needed. The lab <br /> will perform all required water sample testing (to include ph, <br /> conductivity, temperature, etc . ) <br /> • Total cost for the Main Relief Canal Project for 1 year is : $46,950.00 <br /> This total amount is for the Installation, Operation, and Maintenance <br /> of two sites, 1 ) an Influent Station; 2) an Effluent Station <br /> Here is a breakdown of the per site annual cost : <br /> Summary Table : <br /> Site Installation One event per site $ 1 ,750 . 00 <br /> Site Removal One event per site $ 875 . 00 <br /> Site QA Visits Four visits per month = <br /> $ 175 per visit * 4 visits per $8 ,400 .00 <br /> month * 12 months per year <br /> Site Administrative Work 2 hours per month * $ 75 per $ 19800 . 00 <br /> hour * 12 months per year <br />