My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-207
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2016 4:02:52 PM
Creation date
9/30/2015 9:47:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/13/2006
Control Number
2006-207
Agenda Item Number
7.O.
Entity Name
Malcolm Pirnie, Inc
Subject
alternate design to the vortex treatment system for the north, main
and south relief canals-Work Order No. V1
Supplemental fields
SmeadsoftID
5681
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C . The CONSULTANT will submit one set of technical specifications at the 60 percent <br /> completion levels . The 60 percent submittal will include a table of contents and a <br /> preliminary draft of all the required technical specification sections . <br /> 2. 2 90 Percent Design <br /> The 90 percent level of completion is defined as the incorporation of all COUNTY <br /> comments received and verified after the 60 percent review with the COUNTY . The <br /> drawings will be at a level of completion that will allow the project to be bid . The <br /> CONSULTANT will submit one set of technical specifications and drawings at the 90 <br /> percent completion level . If requested by the COUNTY , the CONSULTANT will meet with <br /> the COUNTY to discuss the submittal and subsequently revise the drawings per the <br /> COUNTY' s comments . <br /> 2. 3 100 Percent Design <br /> At the 100 percent submittal , two sets of the drawings will be submitted together with an <br /> electronic copy using AutoCADTm Release 2005 or later format . The 100 percent submittal <br /> will also include bid schedule , table of contents , and technical specifications in electronic <br /> Microsoft WordTM format . The CONSULTANT will prepare and submit an Engineer's <br /> Opinion of Probable Construction Cost for the project at the 100 percent design level . <br /> 2 .4 Conformed Sets <br /> Conformed sets - After the project is bid but before the COUNTY awards the construction <br /> contract , provide five signed and sealed copies of the conformed structural and electrical <br /> contract drawings and five signed and sealed sets of the conformed technical <br /> specifications . <br /> 3. 0 BIDDING ASSISTANCE AND CONSTRUCTION SERVICES <br /> The CONSULTANT will provide bidding assistance (including pre- bid conference) and <br /> construction services at an hourly rate as requested in writing by the COUNTY . <br /> " END OF ATTACHMENT 1 " <br />
The URL can be used to link to this page
Your browser does not support the video tag.