Laserfiche WebLink
Ms . Polly Kratman <br /> 17 January 2007 <br /> Page 6 <br /> engineering reports and drawings in support of the permit application in accordance with Chapter <br /> 62-701 , FAC. Geosyntec will provide four complete copies of the application to FDEP Central <br /> District and two copies to SWDD. <br /> Activities required for the completion of the permit application not included in other tasks, and <br /> activities required for the compilation, reproduction, and distribution of the permit application <br /> are included in Phase 2 . <br /> Phase 3 : Response to Regulatory Comments <br /> Following submittal of the Permit Application, GeoSyntec will meet with FDEP to present and <br /> discuss the Closure Permit Application. Geosyntec will provide FDEP with written responses to <br /> requests for additional information throughout the course of the permit review process. For the <br /> purpose of the budget estimate, GeoSyntec has estimated one response is required. <br /> Phase 4: Construction Procurement Services <br /> GeoSyntec will provide the engineering services required for SWDD to construct the closure <br /> system for the C&D debris on Segment 1 landfill . It is understood that SWDD will contract the <br /> construction services of the closure system to Waste Management (WM), the current contractor <br /> for operation of the Class I landfill, including the on-going placement of C&D debris on Segment <br /> 1 . As part of this task, Geosyntec will prepare construction documents and a construction cost <br /> estimate . <br /> Subuhase 4. 1 - Construction Documents <br /> Geosyntec will prepare a set of construction drawings for the closure system specified in the <br /> Closure Permit Application . The construction drawings will be extracted from the permit <br /> drawings and will include sufficient details for construction of the closure system , storm water <br /> features, and other related construction activities associated with the closure of the C&D disposal <br /> area within Segment 1 . The construction drawings will include control points along the top of <br /> berms, toes of slopes, and other critical locations, including 50-ft grid intervals, to facilitate <br /> construction and certification of the Project . One set of construction drawings will be prepared <br /> for the entire disposal area of C&D debris within Segment 1 . However, it is noted that the <br /> installation of the closure system will be an on-going effort that will likely involve multiple <br /> installation time periods as different areas reach final waste grades . <br /> x106230/01 -17-2002 3170001doo <br /> etl ` i IICCrS I '� Ciell usts I innoA ators <br />