Laserfiche WebLink
I. The Roadway set of plans shall consist of the following : <br /> 30% 600vo 90016 10006 <br /> Cover Sheet X X X <br /> Typical Sections X X X <br /> Summary of Quantities and General Notes X X <br /> Summary of Drainage Structures Sheets X X X <br /> Details X X <br /> Plan and Profile Sheets (40 scale) X X X <br /> Cross Sections at 100 ft interval X X X <br /> Landscape Plans X X X <br /> Signage & Pavement Marking Plans (100 scale) X X X <br /> Signalization Plans X X X <br /> Bridge Plans X X X <br /> Intersection Plan & Details X X X <br /> Drainage Maps X X X <br /> NPDES Plans X X <br /> Stormwater Pollution Prevention Plans (S WPPP) X X <br /> Computation Book X <br /> Construction Cost Estimate and Quantities X X X X <br /> "SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following: <br /> The time for completion of the 90% design drawings, permit applications, and Engineer's <br /> Opinion of Probable Construction Cost for the project shall be eighteen ( 18 ) months from the date of <br /> execution of this AGREEMENT . Once permits are received, 100% design drawings shall be <br /> completed 90 days thereafter. <br /> Page 8 of 16 <br /> G:\Adrnit \Alarketing\Proposals\WPB\2006\43rd Avenue Arcadis Agrement 8- 11 -06.doc <br />