Laserfiche WebLink
FEE BREAKDOWN Attachment A <br /> Project Name: 70th Avenue Improvements Dunkelberger Engineering & Testing , Inc. <br /> Indian River County, Florida 523A NW Enterprise Drive <br /> DET Proposal No. : P07-11 -2558 Port St. Lucie , Florida 34986 <br /> Proposal Date : November 5, 2007 Ph: (772) 343-9787 Fx: (772)343-9404 Contact: M . Bahiradhan <br /> Geotechnical Services Contract Amount Previously Completed Completed This Invoice Completed to Date Remaining on Contract <br /> Itemized Services Qty Unit Price Amount Qty Amount Qty Amount Qty Amount Qty Amount <br /> A. Field Exploration <br /> Mobilization' 1 EA $350 .00 $350.00 0 $0.00 0 $0.00 0 $0. 00 1 $350 .00 <br /> Auger Borings' 84 LF $9.25 $777.00 0 $0. 00 0 $0.00 0 $0. 00 84 $777 .00 <br /> Senior Eng . . Tech . (MOT)**** 6.4 HR $55.00 $352.00 0 $0.00 0 $0.00 0 $0. 00 6.4 $352 .00 <br /> Senior Eng . Technician'*' 15 HR $55 .00 $825.00 0 $0.00 0 $0. 00 0 $0.00 15 $825 . 00 <br /> Subtotal $2,304.00 $0.00 $0.00 $0.00 $2,304.00 <br /> *Mobilization of truck-mounted drilling equipment. <br /> " 14 Auger Borings @ 6 ft. deep at 200-foot interval . <br /> Mobilization of MOT signs and rental costs <br /> Coordination of field work, boring layout, utility notification , perform muck probes , if necessary, and site reconaissance. <br /> B . Laboratory Testing <br /> Visual Class. & Lab Assign . 2 HR $75 .00 $ 150. 00 0 $0.00 0 $0.00 0 $0.00 2 $ 150.00 <br /> Sieve Analysis 4 EA $45 .00 $180.00 0 $0.00 0 $0.00 0 $0.00 4 $ 180.00 <br /> Moisture Content 18 EA $ 10.00 $ 180.00 0 $0.00 0 $0.00 0 $0.00 18 $ 180.00 <br /> Organic Content 4 EA $30 .00 $ 120.00 0 $0.00 0 $0.00 0 $0.00 4 $ 120.00 <br /> Percent Fines 10 EA $30 .00 $300.00 0 $0.00 0 $0. 00 0 $0.00 10 $300.00 <br /> Limerock Bearing Ratio Tests 2 EA $300 .00 $600.00 0 $0.00 0 $0.00 0 $0.00 2 $600.00 <br /> Liquid and Plastic Limits 4 EA $90.00 $360. 00 0 $0.00 0 $0.00 0 $0.00 4 $360.00 <br /> Subtotal $1 ,890.00 $0.00 $0.00 $0.00 $1 ,890.00 <br /> C . Engineering , Reporting <br /> & Meetings <br /> Principal Engineer 1 HR $ 145.00 $ 145. 00 0 $0. 00 0 $0.00 0 $0.00 1 $ 145.00 <br /> Senior Geotechnical Engineer 4 HR $ 120.00 $480. 00 0 $0.00 0 $0.00 0 $0.00 4 $480.00 <br /> Project Geotechnical Engineer 16 HR $95.00 $1 , 520. 00 0 $0.00 0 $0.00 0 $0.00 16 $1 ,520.00 <br /> CADD 4 HR $50.00 $200. 00 0 $0. 00 0 $0.00 0 $0.00 4 $200.00 <br /> Ward Processor 2 HR $40 .00 $80. 00 0 $0.00 0 $0.00 0 $0.00 2 $80.00 <br /> Subtotal $2,425.00 $0.00 $0.00 $0.00 $29425.00 <br /> Total-Geotechnical Services $6,619.00 $0.00 $0.00 $0.00 $6 ,619.00 <br /> Say, Estimated Fee of $6 , 617 <br /> Dunkelberger Engineering & Testing, Inc. <br /> p-70th Avenue Improvements-revised <br />