Laserfiche WebLink
ESTIMATED SCOPE AND BUDGET EXHIBIT <br /> Construction. Observation and Matorlals Testing Services <br /> CR 512 510 Corridor Improvements <br /> Indian River County, Florida <br /> Project Name: CR 512;510 Convict Improvements Dunkclbcrgu EnOinceting &'Testing, Inc.. <br /> Indian River Cot nty; Florida 523A NW Enterprise Drive <br /> Client: ladian River County • Engineering Ann: Mike Nfxcin Port St. Ludo, Florida 34986 <br /> DET Proposal No: P06-10.3195 (772) 344-9787 FAX (772),343-0404 <br /> Date: July. 6, 2006 Contact: David T. Younosbom <br /> ConsfinI7 SMvices VaU Anrount ProvioirVY efuvi .. elcd This lnvoico Comw eted fn Data Romuiiur cn ConVxl <br /> ttamincd services Dry Und Price Amount City, . Amount Qty Amount :Dry Amount Dfy Amounl. <br /> i• riold lospuclion &Testing <br /> A Soil Inspections • Sr. Tectink an 70 tour $49,00 53.430.00 0 50.00 0 50.03 0 $0.00 701 S3.430:00 <br /> B: Density Tests <br /> • Embankment. 300 test 520.00 $6,000. 00 0 $0.00 0 $0.00 0 S0.DO ::00 S6,900,0 <br /> - Strom Sewer 850 test $20.00 $ 17,000.00 0 SO.00 0 $0,00 0 S0.0 650 ;.$17,600,0 <br /> - Snowy SewtY 350 test $20.00 .$7,000.00 0 50.00 0 50:00 0 $0.00 350 $7,000,00 <br /> - Wwarrnain 1501 test I 520.00 53,000.00 . 0 Woo 0 50.00 0 - SO.O .150 S3;0O.0 <br /> - Curb Pad 200 test $20.00 34.000.001 0 SO.001 0 54:00 0 50.0 - 200 54.000.00 <br /> - Stabilized Subgmdc 200 test 520.0 54:000.00 0 $0.00 0 $0.00 0 SO-00 FOO 54:000.00 <br /> - Base Rock 20 test $20.00 $4.00.0 '0 SOOo ol SO.00 0 50.00 - 200 ` $4.000.00 <br /> - Sidewalk Subgnade 80 test 520.00 $1 .GDO.0 70 50.00 0 $0.00 0 $0.0 80 51;600.00 <br /> C. Canaete Testing <br /> - CurD & Sidewa'ks 70 set $70.00 54,900.00 -0 S0.0 0 50:00 0 $0.00 70 54 :900.00 <br /> - Ke caps 8 86dge 80 set $70.00 $5,600.00 ' 0 50.00 0 50:00 0 $0,00 nb . WWI) 00 <br /> Subtotal S60,530.00 1 $0.00 $0,00 SO-DO $60;530:00 <br /> 11: Laboratory TeSfing <br /> - Modified Pro= (T- ISO or D=1557) . 30 test $70.0 .$2,1 DO-00 -0 50.00 0 $0.0 0 $0,0 30 52,100.0 <br /> - Standard Proctor (T,99.or D-698). 0 lest $70.00 $0.00 0 $0.0 0 $D.0 4 50.0 0 " $0:0 <br /> -.Sieve Anays:s (Percent Fines) 30 test $25.0 S750.0 0 50.0 0 $0.0 0 $0.00 30 $750.0 <br /> Limerock Bearing Ratio,(L6R) s0 .test 5250.0 - $12;500.00 0 $0.00 0 SO.OD 0 SD.00 50 $ 12,50.0 <br /> Florida Being vaue (F(3V) 0 test 520.00 50.00 0 SG.00 . 0 50.0 0 50.00 0 ''SOD0 <br /> Subtofai 515,350.0 30.00 .' $0,00 $0.00 $15,350.00 <br /> N1; Engineering d <br /> RepoMng <br /> Principal Engineer 40 hour 5120.00 54,800.00 0 $0,00 0 S0:0O 0 SO-001 40 54,800.0 ' <br /> Project EngineerrUuelogist 80 hour 585.00 $0,80.00 0 $0.00 0 soed 0 $0.00 1301 56.800.00 <br /> Acrd Prcceasot 80 rout S4D:00 53.20.00 50.00 0 $0.00 0 S0.0 n0 $3,200.00 <br /> Subtotal $140800.00 So.Uo $0.00 0.0 S14;800.00 <br /> TOTAL 590,680:00 SO.001 1 $0. 00 50.00 $90,690.00 <br /> umt txca�dcnrn <br />