Laserfiche WebLink
ATTACHMENT 3 to WORK ORDER NO. 1 <br />1. TIME FOR COMPLETION <br />The following schedule is presented as a guide to the timeline for completion of this <br />project. This schedule will be reviewed as part of Task 1, design memorandum <br />preparation. Because this project includes the use of sub -consultants, some of which are <br />not directly responsible to ECT for performance of their services, and requires <br />environmental permitting by SJRWMD, it is recognized that this schedule may be modified <br />as the project proceeds. <br />Task 1, Design Memorandum — To be completed within 30 days following receipt of <br />Notice to Proceed (NTP). <br />Tasks 2 through 7, 20% Completion — To be completed within 45 days following <br />acceptance by the COUNTY of the design memorandum. <br />Tasks 2 through 7, 50% Completion — To be completed within 45 days following <br />acceptance by the COUNTY of 20% Completion drawings. <br />Tasks 2 through 7, 90% Completion — To be completed within 45 days following <br />acceptance by the COUNTY of 50% Completion drawings. <br />Task 8 — Permit applications to be completed within 30 days following acceptance <br />by the COUNTY of 90% Completion drawings. <br />Tasks 2 through 7, 100% Completion — To be completed within 30 days following <br />approval of SJRWMD ERP and COUNTY site development and stormwater management <br />permits. <br />Task 9 — To be completed during the prosecution of Tasks 1 through 7. <br />Task 10 — Schedule to be determined by the COUNTY. <br />Task 11 — Schedule to be determined by the COUNTY. <br />Task 12 — To be completed during the prosecution of Tasks 1 through 7. <br />**END OF ATTACHMENT 3** <br />7 <br />PA2004\P1404-0037-1400 IRC Continuing Services\ECT - Work Order #1 - Draft.doc <br />cCi <br />Environmental Consulting & Technology, Inc. <br />