Laserfiche WebLink
ATTACHMENT 1 to WORK ORDER NO. 1-GKE <br />I. CONSULTANT'S SCOPE OF SERVICES <br />CONSULTANT will work with County staff to finalize the design of wetland and <br />upland plantings and the creation of a new lake (southwest lake) at the Egret Marsh <br />Stormwater Park. Services include, but are not limited to the following general tasks: <br />A) Detailed site inspection of proposed lake area and exotic vegetation removal <br />areas. <br />B) General lake design with island(s). <br />C) General lake contour sketches associated with shorelines, island(s), and <br />shallow water/deep water aquatic habitat creations and upland habitat <br />creation. <br />D) Coordinate with Indian River County and site contractor for exotic/invasive <br />vegetation removal from 4.0± acre lake site and surrounding uplands. <br />Provide supervision of work as needed. <br />E) Lake and island(s) planting plan for both upland and wetland plant species. <br />F) Assistance with landscape design for remainder of site where landscape <br />design is not provided by others. <br />G) Meetings with Indian River County and/or contractors as needed. <br />2. COUNTY RESPONSIBILITIES <br />COUNTY will be responsible for providing surveys, overall site drawings, drafting <br />services, geotechnical data, and payment for permit application fees. COUNTY will <br />prepare the front-end construction contract and bidding documents as necessary. <br />**END OF ATTACHMENT 1** <br />2 <br />FAPublic Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\GK Environmental\GK Environmental <br />- Work Order #1.doc <br />