My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-195a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-195a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:49:24 AM
Creation date
9/30/2015 8:49:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/07/2005
Control Number
2005-195A
Agenda Item Number
11.I.1
Entity Name
Hydromentia, Inc.
Subject
Egret Marsh Regional Stormwater Park System
Work Order No.1
Area
Egret Marsh
Supplemental fields
SmeadsoftID
4975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 to WORK ORDER NO. 1 <br />System Design and Monitoring Plan <br />1. GENERAL <br />This Work Order shall be included as an Attachment to the "Continuing Contract <br />Agreement for Professional Services" (" Agreement") dated March 15, 2005, between <br />Indian River County, Florida ("COUNTY") and HydroMentia, Inc. ("Consultant"),and <br />upon execution and delivery of a 66notice4o-proceed" shall become part of the <br />Agreement. It is intended and required that all services described within this Work Order <br />shall be completed and provided in accordance with applicable provisions within the <br />Agreement. <br />Services described within this Work Order shall include those associated with the <br />development of engineering calculations, construction drawings, specifications, contract <br />documents, and system monitoring and quality assurance plans for those components <br />of the proposed Egret Marsh Regional Stormwater Park directly associated with the <br />operations and monitoring of a proposed Managed Aquatic Plant System (MAPS), <br />specifically the Algal Turf Scrubber® (ATSTM) or ("ATSTM Project") as contemplated by <br />the COUNTY, and the general nature of which is described within the document entitled <br />"Indian River Egret Marsh Regional Stormwater Management Facility Project" ("Egret <br />Marsh Project'). Included as part of the Egret Marsh Project document, is a list of <br />project objectives, which are summarized within this Work Order in the subsequent <br />section. These project objectives shall apply to this Work Order <br />In its performance of services as detailed within this Work Order, HydroMentia, Inc. will <br />provide information, including engineering drawings and calculations, that is considered <br />proprietary to Hydromentia. COUNTY agrees to use such information only to evaluate <br />its interest in purchasing from HydroMentia, the installed process known as Algal Turf <br />Scrubber® or ATSTM , for the specific site application, and only the specific site <br />application, as contemplated within this Work Order, <br />2. PROJECT OBJECTIVES <br />The objectives of the ATSTM Project are as follows: <br />a. Reduce high levels of nitrogen, phosphorous, suspended solids, and other <br />loads (as applicable and practical), from an agricultural basin to the Indian <br />River Lagoon in the vicinity of Vero Beach, Florida. <br />b. Evaluate the ATSTM Managed Aquatic Plant Systems (MAPS) technology for <br />its ability to help meet the Countywide interim goal of 50% pollutant load <br />reduction. <br />2 <br />R\Public Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\Hydromentia - Work Order <br />#1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.