My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-408
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-408
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:21:09 PM
Creation date
9/30/2015 11:29:45 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/04/2007
Control Number
2007-408
Agenda Item Number
7.K.
Entity Name
Masteller,Moler,Reed & Taylor
Subject
CR 512 Phase 3 Wetland Mitigation Work Order No.1
Area
CR 512
Project Number
9611A
Supplemental fields
SmeadsoftID
6704
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRG Work OQer N l <br /> County Road 512 phase 3 - Wetland Mitigation As-built -y <br /> November 21 , 2007 ( - <br /> Page I of 2 <br /> pW4 ! <br /> Board of County Commissioners <br /> Administration - Building A (South) <br /> 1801 27th Street <br /> Vero Beach, Florida 32960 <br /> Telephone: (772) 567-8000 FAX : 772-778-9391 <br /> Project: <br /> County Road 512 Phase 3 <br /> Wetland Mitigation As-built Survey <br /> IRC Project 9611A <br /> WORK ORDER NO . 1 (Engineering/Surveying ) <br /> FOR <br /> PROFESSIONAL SERVICES AGREEMENT <br /> ANNUAL SURVEYING and MAPPING/GIS SERVICES <br /> WITH <br /> Masteller, Moler, Reed & Taylor, Inc. <br /> In accordance with Contract No. 0725 2007-2009 <br /> This Work Order No. 1 is in accordance with the existing AGREEMENT dated November 6t" <br /> 2007 between Masteller, Moler, Reed & Taylor, Inc. (SURVEYOR) and Indian River County <br /> (COUNTY) . This Work Order No . 1 amends the agreement as follows : <br /> SECTION I — PROJECT LIMITS <br /> This Work Order No . 1 is for the SURVEYOR to perform additional services in connection with <br /> the design and construction of CR512 Phase 3 , in particular; the Wetland Mitigation within the <br /> St. Johns River Water Management District's Buffer Preserve. CR512 Phase 3 limits range from <br /> Roseland Road to County Road 510 , all lying in Indian River County, Florida . <br /> SECTION II - SCOPE OF SERVICES <br /> As agreed upon between Masteller, Moler, Reed & Taylor, Inc. and Indian River County, the <br /> SURVEYOR shall provide Professional Land Surveying services to complete all tasks as <br /> outlined in this Work Order No . 1 described as follows : <br /> Wetland Mitigation/Ditch Plug As-built: <br /> 1 . Perform field location and obtain elevations of approximately (eight) 8 ditch plugs as <br /> constructed by the COUNTY. <br /> 2 . Prepare As-built Survey depicting an overall sketch of the mitigation site and a <br /> section view of each of the ditch plugs . <br /> 3 . Upon completion , provide five (5) hard copies and a digital file of the As-built Survey. <br /> SECTION III — TIME FOR COMPLETION , DELIVERABLEWWORK PRODUCT <br /> Project shall be completed within thirty (30) business days from Notice to Proceed . <br /> Survey shall be supplied as a topographic survey of the limits of County Road Phase 3 project. <br /> SECTION IV — COMPENSATION <br /> The COUNTY agrees to pay, and the SURVEYOR agrees to accept, for services rendered as <br /> identified in Sections I , 11 and III of this Work Order No . 1 , a lump sum fee of $ $7 , 500 . 00 . <br /> F.\Engineering\Capital Projects\0725- 2007 Annual Prof. Survey Contrac02007-2008 Projects\MMR&T\CR512 Phase 3 Wetland <br /> Mitigation Asbuilt\0725 WO 1 -CR512 Ph . 3 Wetland Mitigation Asbuilt 12-4-07 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.