Laserfiche WebLink
c <br /> 1 <br /> ATTACHMENT 1 <br /> Project Description <br /> The proposed project will provide for the construction of approximately 13 ,400 linear feet of <br /> master planned Sanitary Sewer Force Main and associated appurtenances . The Master Planned <br /> Sanitary Sewer Force Main is proposed to provide an alternate and more efficient route to <br /> transmit domestic sewage from the south central region of the county to the " West Regional <br /> Wastewater Treatment Plant" . Connection shall be made on the southeast corner of 74"' Avenue <br /> and 16`" Street, and extend a 12 inch diameter Master Planned Sanitary Sewer Force Main along <br /> the east side of 74d' Avenue from 16"' Street south approximately 5 , 650 linear feet to the <br /> intersection with 8d' Street . From this intersection , a 24 inch diameter Master Planned Sanitary <br /> Sewer Force Main runs west approximately 5 , 200 linear feet along the north side of 8 °1 Street to <br /> the intersection with 82"d Avenue . From this intersection, a 24 inch diameter Master Planned <br /> Sanitary Force Main runs south approximately 2 , 550 linear feet along the east side of 82nd <br /> Avenue , and ends approximately 200 feet north of 4"' Street. (See Exhibit "A" for Project Sketch <br /> of Improvements and Exhibit ` B " for Estimated Cost of Improvements) . <br /> Scope of Services <br /> Schulke , Bittle & Stoddard, L . L . C . will provide services including surveying, engineering design , <br /> preparation of Construction Plans , preparation and submittal of permit applications , construction <br /> administration and periodic construction field inspection for the proposed project that will <br /> provide for the construction of approximately 13 ,400 linear feet of master planned Sanitary Sewer <br /> Force Main and associated appurtenances from 16` ' Street, south along 74`" Ave . , then west along <br /> 81' St . , and then south along 82nd Ave . to a point 200 feet north of 4`" Street . ( See Exhibit "A" for <br /> location and Exhibit ` B " for cost tabulation) . <br /> The estimated construction cost of this project is $ 1 , 736 , 185 . 00 <br /> In order to execute this project in the most cost effective manner with the most aggressive <br /> schedule , Schulke , Bittle & Stoddard , L . L . C . is using the following sub -consultants : <br /> • Houston & Bryant, Inc . for the route survey . <br /> • KSM Engineering & Testing, Inc . for soil boring and testing information . <br /> In connection with this project, the County will provide the Engineer with a copy of any pertinent <br /> Preliminary Data or Reports ; all available drawings in electronic Autocad format ; all surveys , <br /> maps and other documentation in the possession of or reasonably available to the County that are <br /> pertinent to the project . <br /> Services not included in this scope of services are listed as follows : <br /> • Title Work or Research of Public Records for Determination of the existence of <br /> easements or rights-of-way along the route of the proposed sewer force main . <br /> • Excavation for field verification of actual locations of existing underground <br /> utilities and structures . It is requested that Indian River County provide the <br /> excavation as directed by Schulke , Bittle & Stoddard, L . L . C . <br /> • Any services in connection with the project not otherwise provided for in this <br /> scope of services . <br /> Page 1 of 3 <br />