My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-138
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 12:25:18 PM
Creation date
9/30/2015 8:38:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/19/2005
Control Number
2005-138
Agenda Item Number
11.J.1
Entity Name
Schulke, Bittle & Stoddard,L.L.C.
Subject
Master Planned Force Main (UPC 2598) Work Order No.1
Area
82nd Ave., 8th. St.,74th. Ave.
Supplemental fields
SmeadsoftID
4878
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 2 <br /> LUMP SUM FEE TABULATION - TASK 2 <br /> INDIAN RIVER COUNTY <br /> 240' 112" FORCE MAIN <br /> ENGINEERING DESIGN / PREPARATION OF CONSTRUCTION PLANS & PERMITTING APPLICATIONS / <br /> PREPARATION OF SPECIFICATIONS AND BID DOCUMENTS <br /> DESCRIPTION Professional Engineer Project Engineer (E . I ) Designer (CAD) Administration <br /> SCOPE OF WORK = 1 $ 135.00 $ 100 .00 $70 .00 $40.00 Total Comments <br /> Hours Amount Hours Amount Hours Amount Hours Amount Cost <br /> Engineering Design 82 $ 11 ,070 32 $2,240 25 $ 1 ,000 $ 14,310 Coordinate with Consultants, <br /> Establish F . M . Route. Review IRC <br /> Master Plan for conformance. <br /> Prepare preliminary cost estimate. <br /> Coordinate with IRCUD . Meet with <br /> IRC Engin. And IRFWCD RE: <br /> Soils Consultant $4 ,000 Route. <br /> Preparation of Construction 114 $ 15,390 265 $ 18,550 25 $ 1 ,000 $34,940 <br /> Plans <br /> Preparation & Acquisition of Permits needed from FDEP & <br /> Permits 46 $6 ,210 24 $960 $7, 170 FECR and easement needed from <br /> 53rd St. to Central WWTP <br /> Prepare Specifications and 46 $6,210 8 $560 28 $ 1 , 120 $7 ,890 Includes Final Engineer's estimate <br /> Bid Documents of construction cost <br /> Total ( hrs/cost) 288 $38 ,880 305 $21 ,350102 $4 ,080 $68 ,310 <br /> P . 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.