Laserfiche WebLink
ATTACHMENT 1 <br />To <br />Amendment 1 <br />To <br />Work Order Number 1 <br />74th Avenue Force Main <br />Project Description <br />I <br />The proposed project will provide for the construction of approximately 13,230 linear feet of <br />master planned Sanitary Sewer Force Main and associated appurtenances. The Master Planned <br />Sanitary Sewer Force Main is proposed to provide an alternate and more efficient route to <br />transmit domestic sewage from the south central region of the county to the "West Regional <br />Wastewater Treatment Plant". Connection shall be made on the southeast corner of 74th Avenue <br />and 16`h Street, and extend a 12 inch diameter Master Planned Sanitary Sewer Force Main along <br />the east side of 74th Avenue from 16th Street south approximately 2830 linear feet to the <br />intersection with 12th Street. From this intersection, a 12 -inch diameter Master Planned Sanitary <br />Sewer Force Main runs west approximately 5,200 linear feet along the north side of 12th Street to <br />the intersection with 82nd Avenue. From this intersection, a 12 inch diameter Master Planned <br />Sanitary Force Main runs south approximately 2,600 linear feet along the west side of 82nd <br />Avenue to the intersection of 82nd Avenue where it connects to the existing force in 8th Street, this <br />force continues along east side of 82nd Avenue south from the intersection of 8th Street and 82nd <br />Avenue with approximately 2,600 linear feet of 24 -inch diameter pipe and ends with a connection <br />to the existing 24 -inch diameter force main in 4" Street. (See Exhibit "A" for Project Sketch of <br />Improvements and Exhibit "B" for Estimated Cost of Improvements). <br />Scope of Services <br />Schulke, Bittle & Stoddard, L.L.C. will provide services including surveying, engineering design, <br />preparation of Construction Plans, preparation and submittal of permit applications, construction <br />administration and periodic construction field inspection for the proposed project that will <br />provide for the construction of approximately 13,230 linear feet of master planned Sanitary Sewer <br />Force Main and associated appurtenances from 16th Street, south along 74th Ave., then west along <br />12th St., and then south along 82"d Avenue to the intersection of 4th Street and 82nd Avenue where <br />it connect to an existing force main.. (See Exhibit "A" for location and Exhibit "B" for cost <br />tabulation). <br />The estimated construction cost of this project is $1,630,255.00 <br />In order to execute this project in the most cost effective manner with the most aggressive <br />schedule, Schulke, Bittle & Stoddard, L.L.C. is using the following sub -consultants: <br />• Houston & Bryant, Inc. for the route survey. <br />• KSM Engineering & Testing, Inc. for soil boring and testing information. <br />In connection with this project, the County will provide the Engineer with a copy of any pertinent <br />Preliminary Data or Reports; all available drawings in electronic Autocad format; all surveys, <br />maps and other documentation in the possession of or reasonably available to the County that are <br />pertinent to the project. <br />