My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-265
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2016 11:10:14 AM
Creation date
9/30/2015 9:00:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/02/2005
Control Number
2005-265
Agenda Item Number
11.I.2
Entity Name
Peninsula Hydrologic Data Specialists, Inc.
Subject
East Roseland Stormwater Improvement Project
Work Order No.1 Stormwater Samples
Area
Roseland Pond
Supplemental fields
SmeadsoftID
5114
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Roseland QAPP <br /> Section A <br /> Revision No . _ <br /> Date : 11 / 16/04 <br /> Page 9 of 22 <br /> 11 . Copper -- EPA 200 . 7 , 200 . 8 , 6010 , or 6020 <br /> 12 . Cadmium -- EPA 200 . 7 , 200 . 8 , 6010 , or 6020 <br /> 13 . Chromium -- EPA 200 . 7 , 200 . 8 , 6010 , or 6020 <br /> These parameters will be measured for 7 post-construction rainfall events . <br /> The water quality samples will be composite samples taken by automatic <br /> samplers equipped with peristaltic pumps and flow meters . Each automatic <br /> sampler will take flow-weighted composite samples ( i . e , the amount of sample <br /> collected is proportional to the flow rate ) . <br /> Refer to Figure A . 2 for the automatic sampler and field sampling locations . <br /> All laboratory analysis will be performed in accordance with U . S . EPA and FDEP <br /> approved protocols . All analytical activities and data quality objectives will <br /> correspond to Chapter 62- 160 , April 9 , 2002 version of the SOPs . <br /> A6 . 3 Proiected Schedule and Scope of Work <br /> 1 . Estimated Project Beginning Date : January 2004 <br /> 2 , Estimated Project Ending Date : March 2006 <br /> Major Proiect Tasks <br /> Specific Project Activity Scheduled Date ( 1 ) <br /> 1 . Secure Testing Laboratory January 2005 <br /> 2 . Coordinate With Tasting I ahoratonr Jany Tarr 7nr1 � <br /> 3 . Finalize automatic sample location points March 2005 <br /> 4 . Project Construction Start date January 2005 <br /> 5 . Post-Construction sampling/analysis May 2005 - December 2005 <br /> 7 . First bimonthly report July 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.