Laserfiche WebLink
East Roseland QAPP <br /> Section A <br /> Revision No . _ <br /> Date : 11 / 16/04 <br /> Page 9 of 22 <br /> 11 . Copper -- EPA 200 . 7 , 200 . 8 , 6010 , or 6020 <br /> 12 . Cadmium -- EPA 200 . 7 , 200 . 8 , 6010 , or 6020 <br /> 13 . Chromium -- EPA 200 . 7 , 200 . 8 , 6010 , or 6020 <br /> These parameters will be measured for 7 post-construction rainfall events . <br /> The water quality samples will be composite samples taken by automatic <br /> samplers equipped with peristaltic pumps and flow meters . Each automatic <br /> sampler will take flow-weighted composite samples ( i . e , the amount of sample <br /> collected is proportional to the flow rate ) . <br /> Refer to Figure A . 2 for the automatic sampler and field sampling locations . <br /> All laboratory analysis will be performed in accordance with U . S . EPA and FDEP <br /> approved protocols . All analytical activities and data quality objectives will <br /> correspond to Chapter 62- 160 , April 9 , 2002 version of the SOPs . <br /> A6 . 3 Proiected Schedule and Scope of Work <br /> 1 . Estimated Project Beginning Date : January 2004 <br /> 2 , Estimated Project Ending Date : March 2006 <br /> Major Proiect Tasks <br /> Specific Project Activity Scheduled Date ( 1 ) <br /> 1 . Secure Testing Laboratory January 2005 <br /> 2 . Coordinate With Tasting I ahoratonr Jany Tarr 7nr1 � <br /> 3 . Finalize automatic sample location points March 2005 <br /> 4 . Project Construction Start date January 2005 <br /> 5 . Post-Construction sampling/analysis May 2005 - December 2005 <br /> 7 . First bimonthly report July 2005 <br />