My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-265
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2016 11:10:14 AM
Creation date
9/30/2015 9:00:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/02/2005
Control Number
2005-265
Agenda Item Number
11.I.2
Entity Name
Peninsula Hydrologic Data Specialists, Inc.
Subject
East Roseland Stormwater Improvement Project
Work Order No.1 Stormwater Samples
Area
Roseland Pond
Supplemental fields
SmeadsoftID
5114
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Roseland QAPP <br /> Section B <br /> Revision No . _ <br /> Date : 7/23/04 <br /> Page 16 of 22 <br /> B2 . 2 Equipment Needed for Sampling <br /> Two automatic stormwater samplers (America Sigma Model 900 MAX) with <br /> plastic sample containers with Teflon or plastic tubing and an associated bubbler <br /> or area velocity flow meter as pertinent . <br /> B2 . 3 Support Facilities Required <br /> None required . <br /> B2 . 4 Individuals Responsible for Corrective Action <br /> Michael Wickwire , Project Quality Assurance Officer, is responsible for all <br /> necessary corrective action related to sampling . He will also collect the <br /> composite samples from the automatic samplers and reset them for the next <br /> sampling event . <br /> B2 . 5 Process for Preparation and Decontamination of Sampling Equipment <br /> The sampling set-up procedure will include proper decontamination of the <br /> sampling tubing and container. During the sampling , the automated samplers <br /> will be programmed to perform pre- and post-sample rinse and purge cycles in <br /> order to insure the sample taken is an accurate representation of the flow at the <br /> time of sampling . Disposal protocols will be handled according to the following <br /> protocols : Indian River County will comply with 62 - 160 April 9 , 2002 version of <br /> the SOPs . <br /> 132 . 6 Selection and Preparation of Sample Containers and Determination of <br /> Sample Volumes <br /> Sample containers will be plastic , which is a proper material for all of the tests <br /> that will be performed on the stormwater. To provide enough stormwater for the <br /> various tests , a minimum sample volume will be 4 , 800 ml per sample container . <br />
The URL can be used to link to this page
Your browser does not support the video tag.