My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-265
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2016 11:10:14 AM
Creation date
9/30/2015 9:00:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/02/2005
Control Number
2005-265
Agenda Item Number
11.I.2
Entity Name
Peninsula Hydrologic Data Specialists, Inc.
Subject
East Roseland Stormwater Improvement Project
Work Order No.1 Stormwater Samples
Area
Roseland Pond
Supplemental fields
SmeadsoftID
5114
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 to WORK ORDER NO. 1 <br /> OPERATION AND MAINTENANCE OF AUTOSAMPLER DATA <br /> COLLECTION SITES , RENTAL OF AUTOSAMPLER EQUIPMENT , AND <br /> COLLECTION AND DELIVERY OF STORMWATER SAMPLES FOR THE <br /> " EAST ROSELAND STORMWATER IMPROVEMENT PROJECT " <br /> 1 . TIME FOR COMPLETION <br /> There is no set time for completion for this project because the project time is <br /> dependant upon rainfall events . In Attachment 2 , a twelve month sampling period was <br /> assumed in order to arrive at an estimated fee for the Work . <br /> ** END OF ATTACHMENT 3 ** <br /> 5 <br /> CADocuments and Settings\keithm\Local Settings\Temporary Internet Files\OLK2\IRCEROSELANDWO107 . 1105 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.