My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-003
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 10:59:45 AM
Creation date
9/30/2015 10:28:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/09/2007
Control Number
2007-003
Agenda Item Number
7.Q.
Entity Name
Masteller, Moler, Reed and Taylor
Subject
Right-of-Way Mapping Project - Indian River Drive Phase I
Work Order No. 10
Area
Indian River Drive with US Highway 1
Project Number
0634
Supplemental fields
SmeadsoftID
6036
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIGHT OF WAY MAPPING PROJECT / PHASE 1 <br /> INDIAN RIVER DRIVE, SEBASTIAN FLORIDA <br /> SECTIONAL R/W DEED R/W SET QUALITY <br /> ESTIMATEDMANHOURS RECON CONTROL CONTROL ANALYSIS ANALYSIS DRAFTING P. C.P. S CONTROL SUB-TOTALS <br /> CLASSIFICATION RATE <br /> PROFESSIONAL SURVEYORP.SM. 110.00 8 8 8 8 8 $4, 400. 00 <br /> SURVEY PROJECT MANAGER P.S.M. 95. 00 8 24 29 5320. 00 <br /> FIELD CREW SUPERVISOR $90. 00 2 8 8 2 $1,800. 00 <br /> TWO MAN G.P.S. FIELD CREW $135.00 24 96 16 $18,360, 00 <br /> SURVEY C4DD OPERATOR $70. 00 120 $4400. 00 <br /> GEODETIC PROCESSSING 80. 00 10 10 $lz6OO. 00 <br /> TOTAL $39,880. 00 <br /> RIGHT OF WAY MAPPING PROJECT/ PHASE 2 <br /> INDIAN RIVER DRIVE, SEBASTIAN FLORIDA <br /> SECTIONAL R/W DEED R/W SET QUALITY <br /> ESTIMATED MANHOURS RECON CONTROL CONTROL ANALYSIS ANALYSIS DRAFTING P.C.P. S CONTROL SUB-TOTALS <br /> CLASSIFICATION RATE <br /> PROFESSIONAL SURVEYORP.S.M. 110. 00 4 4 4 4 1760. 00 <br /> SURVEY PROJECT MANAGERP.S.M. 95.00 12 12 2280. 00 <br /> FIELD CREW SUPERVISOR 90.00 8 8 2 1 620. 00 <br /> TWO MAN G.P.S. FIELD CREW $135. 00 40 16 7560. 00 <br /> SURVEY C4DD OPERATOR $70.00 90 6 300. 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.