Laserfiche WebLink
RIGHT OF WAY MAPPING PROJECT / PHASE 1 <br /> INDIAN RIVER DRIVE, SEBASTIAN FLORIDA <br /> SECTIONAL R/W DEED R/W SET QUALITY <br /> ESTIMATEDMANHOURS RECON CONTROL CONTROL ANALYSIS ANALYSIS DRAFTING P. C.P. S CONTROL SUB-TOTALS <br /> CLASSIFICATION RATE <br /> PROFESSIONAL SURVEYORP.SM. 110.00 8 8 8 8 8 $4, 400. 00 <br /> SURVEY PROJECT MANAGER P.S.M. 95. 00 8 24 29 5320. 00 <br /> FIELD CREW SUPERVISOR $90. 00 2 8 8 2 $1,800. 00 <br /> TWO MAN G.P.S. FIELD CREW $135.00 24 96 16 $18,360, 00 <br /> SURVEY C4DD OPERATOR $70. 00 120 $4400. 00 <br /> GEODETIC PROCESSSING 80. 00 10 10 $lz6OO. 00 <br /> TOTAL $39,880. 00 <br /> RIGHT OF WAY MAPPING PROJECT/ PHASE 2 <br /> INDIAN RIVER DRIVE, SEBASTIAN FLORIDA <br /> SECTIONAL R/W DEED R/W SET QUALITY <br /> ESTIMATED MANHOURS RECON CONTROL CONTROL ANALYSIS ANALYSIS DRAFTING P.C.P. S CONTROL SUB-TOTALS <br /> CLASSIFICATION RATE <br /> PROFESSIONAL SURVEYORP.S.M. 110. 00 4 4 4 4 1760. 00 <br /> SURVEY PROJECT MANAGERP.S.M. 95.00 12 12 2280. 00 <br /> FIELD CREW SUPERVISOR 90.00 8 8 2 1 620. 00 <br /> TWO MAN G.P.S. FIELD CREW $135. 00 40 16 7560. 00 <br /> SURVEY C4DD OPERATOR $70.00 90 6 300. 00 <br />