Laserfiche WebLink
r <br /> IkC Work Order # 13 <br /> I.R. Drive R/W Map Phase Two <br /> September 11 , 2007 <br /> Page 5 of 6 <br /> EXHIBIT "A" <br /> INDIAN RIVER COUNTY <br /> RIGHT OF WAY MAP CHECKLIST <br /> All Right-of-way projects shall adhere to Chapter 177 & 472 , F. S. and <br /> Chapter 61G17, F.A.C. as minimum and be certified as such. <br /> 1 . Cover sheet/Key sheet. <br /> 2 . Survey notes and report sheet (As applicable). <br /> 3 . Survey control sheet (As applicable and or necessary). <br /> 4. Subsequent R/W map sheets . <br /> 5 . Supply a box or area for COUNTY acceptance and/or certification. <br /> 6. Title Box of each sheet must contain : <br /> a. COUNTY <br /> b. State Road Number <br /> c. Designed, drawn and checked by (use names or initials) & date <br /> d. Scale <br /> e. Field Book References <br /> f Sheet Numbers to be in numerical order ( 1 , 2, 3 , 4, etc.) NOT ( 1 , 1 A, I B, <br /> 2, etc.) <br /> 7. Any notes necessary to set out the type and/or purpose of the map shall be shown. <br /> 8 . Show pertinent dimensions and bearings in the following fashion as the case may <br /> be: <br /> a. Plat — (P) <br /> b. Computed — (C) <br /> c. Field — (F) <br /> d. Deed (D) <br /> 9. Table of Ownerships shall show : <br /> a. Parcel Number <br /> b. Owners Name <br /> c. Recording Data <br /> 10. Show stations and offsets to all Right of Way Breaks . <br /> 11 . Establish a baseline alignment for control and determine location of significant <br /> elements for future monumentation . <br /> 12. Verify that computed distances and bearings are supported by field <br /> measurements. <br /> 13 . Intentionally omitted — to be included in future contract. <br /> 14. Ensure that significant elements of all curves are shown and are correct. Also <br /> show curve data on all sheets where they appear. <br /> 15 . Begin and end R/W Project with Stations . <br /> 16. Stationing in field minimum 500' beyond beginning and ending of project. <br /> F:\Engineering\Capital Projects\0390-Annual survey Contracts\Masteller Moler and Reed\2006-2007` ]R Drive ROW Map\Phase 2, 9- 18-07\0390 <br /> IR Drive Ph 2 ROW Map Work Order # 13 9- 18-07.doc <br />