My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-311
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2016 1:43:20 PM
Creation date
9/30/2015 11:17:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/18/2007
Control Number
2007-311
Agenda Item Number
7.R.
Entity Name
Masteller, Moler,Reed & Taylor
Subject
Work Order No.14 Services Right of Way Mapping Phase 1
Area
Indian River Drive, Sebastian
Project Number
0634
Supplemental fields
SmeadsoftID
6602
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
View images
View plain text
�40tRr � I� <br /> f u <br /> Aoo7 - 3 ! ( <br /> Board of County Commissioners <br /> Administration - Building A (South) <br /> 1801 27th Street <br /> Vero Beach, Florida 32960 <br /> Telephone: (772) 567-8000 FAX : 772-778-9391 <br /> WORK ORDER NO. 14 ( Engineering ) <br /> FOR <br /> PROFESSIONAL SURVEYING SERVICES AGREEMENT <br /> FOR ANNUAL SURVEYING AND MAPPING SERVICES <br /> 2006 -2007 CONTRACT 0390 <br /> WITH <br /> Masteller, Moler, Reed & Taylor, Inc . <br /> In accordance with Contract No . 0390 2005-2006 <br /> Project: <br /> Right-of-Way Mapping Project <br /> Indian River Drive, Sebastian Florida <br /> Phase One — Additional Services <br /> IRC Project 0634 <br /> This Work Order No. 14 is in accordance with the existing AGREEMENT dated September 19th , <br /> 2006 between Masteller, Moler, Reed & Taylor, Inc. (SURVEYOR) and Indian River County <br /> (COUNTY) . This Work Order No . 14 amends the agreement as follows: <br /> SECTION I — PROJECT LIMITS <br /> This Work Order No . 14 is for the SURVEYOR to perform additional services in connection with <br /> the preparation of the Right of Way Survey for the existing 66 foot wide Right of Way for Indian <br /> River Drive, Phase 1 and incorporate into the Right of Way Survey as described in the original <br /> Work Order #10 (Engineering/Survey) for this project. The overall project limits range from the <br /> southern intersection of Indian River Drive with U . S . Highway No. 1 to the northern intersection <br /> of Indian River Drive with U . S . Highway No . 1 (approx. 3. 5 miles) . Phase One of the project <br /> ranges from the northern overall project limits south to the northern City Limits of the City of <br /> Sebastian (approx. 1 . 5 miles) . All lying in Indian River County, Florida . <br /> SECTION II - SCOPE OF SERVICES <br /> As agreed upon between Masteller, Moler, Reed & Taylor, Inc. and Indian River County, the <br /> SURVEYOR shall provide Professional Land Surveying services to complete all tasks as <br /> outlined in this Work Order No . 14 described as follows: <br /> • Right of Way Mapping (Additional Services): <br /> 1 . Conduct research with the Florida Department of Transportation for maps, deeds or <br /> other documents that may relate to or affect the analysis of the location of the Right <br /> of Way as described in the original Work Order #10 (Engineering/Survey) . <br /> 2 . Conduct research with the St. Lucie County Recording Department for maps , deeds <br /> or other documents that may relate to or effect the analysis of the location of the <br /> Right of Way as described in the original Work Order #10 (Engineering/Survey) . <br /> 3. Perform field ties to Point of Commencement of the legal description contained in <br /> Deed Book 538 , Page 541 and depict same on proposed Right of Way map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).