My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-061
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 2:00:02 PM
Creation date
9/30/2015 10:36:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/13/2007
Control Number
2007-061
Agenda Item Number
11.I.2
Entity Name
Arcadis G&M Inc.
Subject
Work Order No.2 4-Lane Widening of 43rd. Ave.
Area
25th St. SW to Oslo Road (9th St. SW)
Supplemental fields
SmeadsoftID
6134
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION III - SCOPE OF SERVICES <br /> A. General <br /> 1 . The ENGINEER will endeavor not to duplicate any previous work done on the project. After <br /> issuance of written authorization to proceed, the ENGINEER shall consult with the COUNTY to <br /> clarify and define the COUNTY'S requirements for the project and review all available data. <br /> 2 . The ENGINEER will attend conferences with the COUNTY and its representatives upon <br /> reasonable request. <br /> 3 . In order to accomplish the work described under this Agreement in the time frames and <br /> conditions set forth in this Agreement, the ENGINEER will observe the following requirements : <br /> a. The ENGINEER will complete his work on the project within the time allowed by <br /> maintaining an adequate staff of registered engineers, draftsmen, and other employees <br /> on the work at all times. <br /> b. The ENGINEER will design the project in such a manner as to be in conformance with <br /> all applicable federal, state and local laws. <br /> C. The ENGINEER will prepare all necessary sketches and completed application forms to <br /> accompany the COUNTY'S applications for required federal, state, or local permits. <br /> d. The ENGINEER will cooperate with the COUNTY in order that all phases of the work <br /> may be properly scheduled and coordinated. <br /> e. The ENGINEER will send a complete preliminary set of construction plans to any city, <br /> county, state or federal regulatory agency, including the St. John ' s Water Management <br /> District (SJRWMD) and the Indian River Farms Water Control District (IRFWCD), <br /> from which a permit or other approval is required prior to final approval of the design <br /> by the Director of the Public Works Department, and will coordinate the project design <br /> with all applicable agencies. <br /> f The ENGINEER will contact all known utility companies having installations in the <br /> immediate vicinity of the proposed work and consider relocation of utilities, if <br /> necessary. The ENGINEER will provide the COUNTY with necessary information <br /> relative to required utility adjustments, relocations and installations and will show all <br /> existing utilities on the final design plans. <br /> Design modifications to existing COUNTY utility lines, if necessary, may be negotiated <br /> by a separate agreement with the County Utility Department, or the County utilities <br /> Department may design modifications with Utility Department Staff or other <br /> consultants . <br /> g. The ENGINEER shall report the status of this project to the Director of the Public <br /> Page 2 of 13 <br /> C:\Documents and Settings\hdeibel\Local Settings\Temporary Internet Files\OLK 13A\43rd Avenue Arcadis Work <br /> Order No 2 Agrement 01 -29-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.