Laserfiche WebLink
Wastewater Capacity and Estimated Flow - Central and North Regional WWTFs <br /> Figure 6 <br /> 10.0 <br /> Treatment Capacity <br /> Demand with Concurrency <br /> Demand less Concurrency <br /> 8.0 <br /> 1 <br /> 1 <br /> - - -" <br /> LL 1 <br /> 4.0 <br /> 1 <br /> 2.0 <br /> 0.0 <br /> 2000 2005 2010 2015 2020 2025 2030 <br /> vean <br /> The Department of Utility Services , based on the projected flows , is requesting an <br /> immediate expansion of the North Regional WWTF from 0 . 85 MGD to 2 MGD AADF <br /> with a Maximum Month Capacity of 2 . 6 MGD . The 2 MGD AADF expansion will be <br /> designed for future facilities and treatment capacity to allow expansion to 4 MGD AADF <br /> with a 5 . 2 MGD Maximum Month Capacity . The expansion (s) are expected to provide <br /> the Department with adequate capacity to meet current and expected growth in the <br /> north region through the current planning horizon , based on the information obtained . <br /> If you have any questions or comments , please feel free to contact me at 863-533-7000 . <br /> Sincerely, <br /> PBS&J , <br /> Robert Beltran , P . E . , DEE <br /> Environmental Services Manager <br /> 9 IRC WWTF Expansion <br /> May 2005 <br />