My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-339
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2016 10:36:35 AM
Creation date
9/30/2015 9:19:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/04/2005
Control Number
2005-339
Agenda Item Number
11.J.4
Entity Name
Brown and Caldwell
Subject
Work Order No.2 Expansion North Regional WWTF
Supplemental fields
SmeadsoftID
5223
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 . Preliminary structure layouts . <br /> 7 . Plant electrical loads and power consumption. <br /> 8 . Residual solids management, including options for odor control. <br /> 9 . Facilities for on-site wet weather storage and disposal of treated effluent. <br /> 10 . Operation and control strategies included for prevention of upsets, alternate disposal <br /> methods , and reliability classification and features . <br /> 11 . An assessment of environmental effects of the project, including odor and noise <br /> control, public accessibility, proximity to existing and proposed residential areas , <br /> flood protection, lighting, and aerosol drift. <br /> 12 . Preliminary opinion of capital cost <br /> 13 . Preliminary project completion schedule . <br /> Five copies of the draft PER will be submitted to Indian River County for review at the 90- <br /> percent complete stage . Following receipt of review comments , ten signed and sealed hard <br /> copies and one electronic copy (compact disc) of the final PER document will be submitted <br /> to the County. The final PER document will be submitted to FDEP in support of the <br /> permit application for expansion and upgrading of the North Regional WWTF . <br /> Task 6 . 0 — FDEP Permitting Assistance <br /> This task involves coordination with the FDEP during preparation of the PER and <br /> obtaining a construction permit for initial improvements at the North Regional WWTF <br /> based on the recommendations of the PER. <br /> Subtask 6. 1 — Pre-Application Meetings with FDEP Staff. Two pre-application <br /> meetings will be scheduled with FDEP staff during preparation of the PER as follows : <br /> 1 . The first meeting will occur early in the project after alternatives for plant improvements <br /> have been identified. The purpose of this meeting will be to familiarize the FDEP staff <br /> with objectives of the project, the proposed schedule and the preliminary improvements <br /> that will be considered for incorporation into the project. <br /> 2 . The second meeting will occur after the County has reviewed the 90 percent complete <br /> PER and recommendations for plant improvements have been finalized . The purpose <br /> of this meeting will be to present the recommended improvements to FDEP staff to <br /> obtain any regulatory input that could facilitate review and approval of the County' s <br /> permit application . <br /> It is assumed that meetings with FDEP staff will be held at the Central District Office in <br /> Orlando . <br /> S: \041077\ IRC; North Regional WWTF Expansion\ Exhibit A_revl .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.