My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-427
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2016 10:51:23 AM
Creation date
9/30/2015 11:31:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/11/2007
Control Number
2007-427
Agenda Item Number
7.K.
Entity Name
Carter Associates,Inc.
Subject
66th. Avenue Roadway Improvements South of SR60
Work Order No.2 Phase 1 and Phase 2
Area
66th Ave. south of SR60
Project Number
9810-A, 9810-B
Supplemental fields
SmeadsoftID
6728
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Work Order #2 <br /> 66Th Ave Roadway Improvements and Design <br /> South of SR60 <br /> Survey Horizontal and Vertical Control <br /> December 11 ", 2007 <br /> Page 3 of 4 <br /> PROPOSAL <br /> EXHIBIT "A" <br /> WORK ORDER NO. 2 <br /> FOR PROFESSIONAL SERVICES AGREEMENT ANNUAL SURVEYING and MAPPINGIGIS SERVICES <br /> CONTRACT NO. 0725 <br /> CARTER ASSOCIATES, INC. <br /> Consulting Engineers & Surveyors <br /> 1708 21 st Street <br /> Vero Beach, FL 32960 <br /> 772-562-4191 <br /> 772-562-7180 Fax <br /> CLIENT: CAI JOB NO. : <br /> [BILLING <br /> N RIVER COUNTY 07-504s <br /> ADDRESS: PHONE # (772) 226- 1386 <br /> y DivisionFAx # <br /> 25th StreetCELL # <br /> Beach , FLorida 32960ECT LIMITS DATE ORDERED: <br /> Horizontal/Vertical Control Survey to support 11 -06-07 <br /> design and construction applications <br /> 66T" AVENUE <br /> EST. COMPLETION DATE <br /> 30 DaYs from acceptance <br /> ORDERED BY: TAKEN BY: EST. COST: <br /> Michael O'Brien , PSM Roger A. Hagler, PLS $ 101550.00 <br /> LEGAL DESCRIPTION (Lot, Block, S/D/Sec-Twp-Rri <br /> PROPERTY STREET ADDRESS <br /> 66th Avenue — Plan Stations 89+97 . 30 to 123+68, Phase 1 , County Project No . 9810-A <br /> and 1 +47F61G176 <br /> 77 to 89+97 . 30 , Phase 2 , Count Project No . 9810-B . <br /> BE PERFORMED : <br /> rtical Control Survey in accordance with the requirements of the <br /> hnical Standards for Surveying and Mapping as set forth in Chapter <br /> e Florida Administrative Code . pursuant to Chapter 472 . 026 of the <br /> e State of Florida . <br /> For the purpose of this survey, the final mapping will be incorporated into two sets of <br /> existing design plans prepared by Carter Associates , Inc . , Indian River County Project <br /> No . 9810-A, Phase 1 and No . 9810-13 , Phase 2 . <br /> See Sheet 2 for Scope Completion Deliverables and Compensation <br /> F:1Engineering\Capital Projectsl0725- 2007 Annual Prof. Survey Contract12007-2008 Projects\Carterl66th Ave Survey Contro110725 <br /> WO 2 Carter-66th Ave. Survey Control 12-11 -07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.