Laserfiche WebLink
tA <br /> Coat Eatimjate (REVISED 1123107) Attachment A <br /> Tost Pile Driving Criteriall roduction Pilo inspection <br /> CR 5121510 <br /> Project NwM: CR 5121510 Dunkolberger Engineering & Testing, Inc. <br /> Client: Indian River County, Florida 623A NW Entorprise Drive <br /> DET Praect No.: 06.10.2310 Pot SL Lucie, Florida 34986 <br /> Date: January 15, 2007 Ph: 2 343.9787 Fx: (772) 543-4404 Contact:. David T. Youn q strurn <br /> Geotechnical Services Previously Cwnpleted Completed This dnvace Completed to Date Romain ' on Contract <br /> Itemized Services Cry Unit Price Amount Oty Amount Oly I Amounl Qty Amount Oty Amount <br /> Trost Pilo Inspection <br /> Senior Inspector' 40 HR $75.00 $31000.00 0 $0.00 0 $0.00 0 WOO 40 S3,0DO-00 <br /> PDA Field Testing (by others) 6 DAY $1 ,9M.00 $11 ,400.00 0 $0.00 0 $0.00 0 $0.00 6 $11 ,400.00 <br /> APWAP Analysis (by others) 10 EA 5550.00. 55.500.00 0 $0.00 0 $0.00 0 50:00 10 S5 504.00 <br /> Project Enginoor" 16 HR $9590 $1 ,520.00 0 SOHO 0 $0 .00 0 $0.00 16 $1 ,520.00 <br /> Subtofel $21 ,420.00 $0.00 $0.00 50.00 $21.420.00 <br /> 8ssed on 4 fest pilon, assuming 1 pilo par day /oro days 10 horns per day . <br /> Bedger allowance W attendWa cm m ., field s!!j4W oordhMUon, and Neal troubleshooting. <br /> N. Production Pile Inspection <br /> Sonior inspector' 100 HE $75.00 $7.500.00 0 SO.00 0 50.00 0 50.00 100 $7,504.00 <br /> Project Engineer"• 8 HR $95.00 $760.00 0 50.00 D 50.00 0 50.00 8 $760.00 <br /> Subtottrl $84260.00 $0,001 1 $0.001 1 $0.00 $81260.00 <br /> ' 8asod w 60 production Piles of a production talo off piles porday @ 10 hours per day . <br /> " Budgeralfowance for Held coordination, and field troubWshooting. <br /> M, Enginooring d Reporting <br /> PDA Report (by others) i EA 5300.00 $300.00 0 50:00 0 $0.00 0 50.00 1 5300.00 <br /> Project Engineer" 18 HR $95.00 $1 ,710.00 0 SO.00 0 $0.00, 0 $0.00 i6 S1 ,710.00 <br /> Princpal Engineer* 6 HR $145.00 5870.00 0 .DO 0 $0.00 0 50.00 6 $670.00 <br /> Clerical 4 HR $40.00 $ 160.00 0 $0.110 0 $0.00 0 $0.00 4 5160.00 <br /> CADD 2 HR $50.00 5100.00 0 $0.00 0 50.00 0. $0.00 2 $100.00 <br /> Subtotal $3.140.00 $0.00 $0.00 $0.00 $3.140.00 <br /> ' Analyze PDA 6 CAPWAP date, devoWp recommendations for produedW Pilo lonitms and insiaaadon (driving) crawto. Prgwanoo of noel repot <br /> Estimated Budget $32,820.00 $0.00 $0.001 1 $0.001 1 $32,820.00 <br /> Mores: Tnh yore rr ro be done M conJuocean wiM oar Addandraborrtary 17C (marorNls) tesdny. <br /> zsuo_aoa aWpcttrav inavrl <br />