Laserfiche WebLink
ATTACHMENT ` 1 ' <br /> SCOPE OF WORK <br /> WORK ORDER NO, 2 <br /> Proiect Description <br /> The proposed project will provide engineering design and permitting for the construction <br /> of upgrades and modifications of the two existing lift stations along with the <br /> reconfiguration of the existing force mains in the Bent Pine Subdivision. Modifications <br /> and upgrades are necessary to provide emergency back-up power for Bent Pine <br /> subdivision and to accommodate additional flow from the proposed Bent Pine Reserves <br /> and Vero Lago subdivisions. The upgrade for each lift station shall consist of up-sizing <br /> and replacing pumps, new control panels and electrical systems, installation of new <br /> emergency diesel generators with automatic electrical power transfer feature and related <br /> site concrete work and landscaping. The construction for the force mains shall consist of <br /> the work necessary to connect the existing force mains adjacent to the dry line force <br /> main, bring it into service, along with the associated appurtenances to include reversing <br /> the direction of flow in the existing force main. (See Exhibit "A" for locations and <br /> Exhibit `B" for cost tabulation). <br /> Scope of Services <br /> Schulke, Bittle & Stoddard, L.L.C. will provide services including surveying, engineering <br /> design, lift station calculations, preparation of construction plans, preparation of <br /> landscape plans to buffer the facility from the adjacent homes, preparation and submittal <br /> of permit applications, construction administration and periodic construction field <br /> inspection for the construction required for upgrading/modifying of the existing lift <br /> stations and force mains in the Bent Pine Subdivision (See Exhibit "A" for location and <br /> Exhibit `B" for cost tabulation). <br /> The estimated construction cost of this project is $ 195 , 800.00 <br /> In order to execute this project in the most cost effective manner with the most aggressive <br /> schedule, Schulke, Bittle & Stoddard, L.L.C . is using the following sub-consultants : <br /> Houston, Schulke, Bittle & Stoddard, LLC, Inc. for the route and site surveys. <br /> In connection with this project, the County will provide the Engineer with a copy of any <br /> pertinent Preliminary Data or Reports; all available drawings in electronic Autocad <br /> format; all surveys, maps and other documentation in the possession of or reasonably <br /> available to the County that are pertinent to the project. <br />